Similar Projects
TBERF Living Shoreline
Infrastructure
Bidding
FL

PPWMD Channel 4 Panel Replacement at 58th Avenue
Infrastructure
Bidding
$2,000,000 est. value
Pinellas Park, FL 33780

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

Seawall Maintenance, Repair and Related Services
Results
Less than $900,000 est. value
Saint Petersburg, FL 33731

Drainage Improvements for Seventh, and Eighth Street - BMP 5
Results
$240,605 to $298,766 est. value
Belleair Beach, FL 33786

Undergrounding Utilities Along Gulf Boulevard - Phase II
Post-Bid
Indian Rocks Beach, FL 34635

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Creek Shoreline Restoration
Results
Less than $600,000 est. value
Saint Petersburg, FL 33711

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Crystal Beach Paving and Drainage Improvements (Pid 002932A)
Results
Less than $1,569,134 est. value
Clearwater, FL

2021 Seawall and Stormwater Imrpovements - Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Drainage - SR 699
Results
$1,783,400 est. value
FL

2021 Seawall and Stormwater Improvements-Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL

Reported 02/25/2022 12:00 AM
Project Title

Seawall Construction - 17th Avenue

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL 33706   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Replacement of the 17th Avenue seawall. The Maintenance Repair work include the Remove of the existing wall, construction of the proposed wall and backfilling behind the proposed wall. Environmental permitting is including for erosion and Siltation control permit etc

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents