Single-Family Homes, Site Development Construction Project Lead, Bakersfield, CA 93308 (Kern County)
Last Updated | 09/27/2022 06:05 AM |
Project Title | Cornerstone Subcontractor |
Physical Address | View project details and contacts |
City, State (County) | Bakersfield, CA 93308 (Kern County) |
Category(s) | Heavy and Highway, Residential |
Sub-Category(s) | Single-Family Homes, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,650,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Housing Authority of the County of Kern is soliciting bids from subcontractors needed to rehabilitate Cornerstone Oildale Drive to be located at 1304 Oildale Drive, Bakersfield, CA. Subcontractors must be licensed in accordance with provisions of Chapter 9 of Division 3 of the Business and Professions Code. All subcontractors will be required to obtain the required business license. Subcontractors must be registered with the Department of Industrial Relations (DIR). All Subcontractors will be responsible for submitting electronic certified payroll reports directly to the Labor Commissioner (Division of Labor Standards Enforcement). Subcontractors must pay the higher of Davis Bacon or State prevailing wages for all work completed onsite. In addition, subcontractors must comply with State apprenticeship requirements. The Housing Authority hereby notifies all bidders that it will affirmatively ensure that in any Contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religious creed, sex, or national origin in consideration for an award. *If you have any questions, please email: aaguilar@geahi.org This project does require State Prevailing Wage This project does require Federal Davis-Bacon Prevailing Wage Bids are requested from the following trades: Finish Carpentry Electrical Cabinets Fire Alarm Fire Sprinklers Insulation Plumbing Bid Bonds - Bidders shall be required to submit a bid guarantee equivalent to 5% of the bid price. Payment Bonds - The successful bidder shall furnish an assurance of completion. This assurance may be one of the following four: A performance and payment bond in a penal sum of 100% of the contract price; or Separate performance and payment bonds, each for 50% or more of the contract price; or A 20% cash escrow; or A 25% irrevocable letter of credit 1. GENERAL: A. Reference to Subcontractor shall mean Insulation Subcontractor. Reference to Owner shall mean Housing Authority of the County of Kern. B. Subcontractor is responsible to check CONTRACT AND APPROVED PLANS before construction. 2. SCOPE: A. Subcontractor shall furnish all labor, material, and equipment to perform the operations necessary to complete all Insulation work as indicated on the plans and specified herein, including but not necessarily limited to the following: B. T24 QII install. C. All exterior open walls to receive R15 insulation. D.Follow all fire notes. 3. MATERIALS A. Batts shall conform to the National Bureau of standards, specifications number HH-I-521C, Type I (unfaced) and type 2 (faced) Class B. All insulation material shall be formed into a uniform friction fit batt having specific dimensions and density in accordance with installation specifications. B. Each batt shall be clearly labeled with R value. C. Blown insulation shall consist of fiberglass materials. 4. INSTALLATION A. Batts shall be installed between ceiling joists, rafters and/or stud friction fitted and stapled in place to completely fill all voids in accordance with manufactures printed instructions and codes B. All batt insulation shall be installed with the R value clearly visible. C. All plumbing pipes hall be exposed to the conditioned air D. Subcontractor shall use a Non-Expanding air Infiltration liquid foam to seal all windows, doors pates, pipes between top plates and inside bays of all exterior walls as per the 2016 title 24 requirements. Subcontractor shall not install insulation unless it can be protected from damage due to inclement weather. Any insulation, kraft facing, or visqueen, which becomes torn, water soaked or otherwise damaged before insulation inspection will not be accepted and will be replaced by subcontractor. E. Subcontractor shall insulate behind showers and in dead spaces as code requires. F. Batts installed in attic space underneath HVAC platform must be secure in place by staples or by binding wire. G. Fire stopping shall be installed at electrical and plumbing penetrations where they occur per local city and fire codes. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |