Similar Projects
The 600 f/k/a City Center
Renovation - 617,453 SF
Conception
Birmingham, AL 35215

Hallmark Property Development - Warrior
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Warrior, AL 35180

Parkside District - Master Plan
Renovation
Design
Birmingham, AL 35216

K & J Elegant Pastries
Build-Out
Design
Birmingham, AL

Jack's Family Restaurant
New Construction, Demolition - 3,275 SF
Post-Bid
Hoover, AL

Jack`s Family Restaurant
Renovation
Post-Bid
Birmingham, AL

Huffman Middle School Gymnasium and Cafeteria
New Construction - 11,058 SF
Results
Center Point, AL 35215

Chick-Fil-A Restaurant
Renovation
Construction
Homewood, AL 35209

Whataburger
New Construction - 3,205 SF
Construction
$1,094,386 est. value
Hoover, AL

Socu Southern Kitchen & Oyster Bar Coming To The Pizitz Food Hall
Renovation
Pending Verification
Birmingham, AL 35203

Soho Taco Restaurant
Renovation
Pending Verification
Homewood, AL 35209

Edolyn's Pies
Renovation
Design
Birmingham, AL

Jack`s Family Restaurant
Renovation - 3,716 SF
Post-Bid
Irondale, AL 35210

Mapco #7554
New Construction - 5,285 SF
Construction
$2,000,000 est. value
Birmingham, AL 35234

Biscuit Love
New Construction - 3,045 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Cahaba Heights, AL

Last Updated 01/25/2023 11:04 AM
Project Title

JEFCOED Kitchen Hood and Serving Line Renovations to Burkett Center and Snow Rogers Elementary School

Physical Address View project details and contacts
City, State (County) Kimberly, AL 35091   (Jefferson County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Per addendum B bid date has been extended to 12/8/22 The work includes the removal and replacement of the existing kitchen exhaust hood and associated components as well as replacement of the serving lines. New kitchen and serving line equipment will be specified and installed in this scope of work. The work will also include relative electrical and plumbing to provide the required service to new equipment. The existing exhaust fan and associated exhaust duct will be replaced. A new make-up air unit along with HVAC equipment at the roof will be replaced and/or added. A cashier's check or bid bond payable to Jefferson County Board of Education in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. The Owner intends to award multiple or single contracts for this work to pre-qualified General Contractor(s). The Owner will accept proposals only from firms which demonstrate their experience and ability to perform the work necessary for this project. Interested General Contractors must submit a Contractor's Qualification Statement, AIA A305. Minimum qualifications to be certified by prospective bidders include: 1) statutory licensor requirements, 2) bonding capacity in excess of $5,000,000 dollars, 3) minimum of five (5) years successful history as an approved, authorized or licensed General Contractor, 4) successful current experience in construction of a size and scope similar to this Project, and 5) submit list of proposed contractor's team including subcontractors. Joint venture arrangements must qualify solely on the strength of the principal firm's qualifications. . The required Form of Certificate is AIA Document A305 Contractor's Qualification Statement 1986 Edition and may be obtained from the Architect. Bids must be submitted on proposal forms furnished by the Architect (Engineer) or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect (Engineer); the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents