Similar Projects
General Contractor Prequalification & Open Enrollment
Post-Bid
Denver, CO

Construction Services Trades from Certified Business
Term Contract
Post-Bid
CO

2021 Renovations at Four Sites
Results
Less than $1,399,317 est. value
Denver, CO

2021 Renovations at Four Sites
Results
Less than $1,399,317 est. value
Denver, CO

Ah Haa School for the Arts
Build-Out - 9,594 SF
Construction
$4,300,000 est. value
Telluride, CO 81435

Centauri High School Requirement Early Site and Utilities Package Project
Construction
La Jara, CO 81140

Nurses Station addition at Campus in the Keystone Resort Area
Addition
Post-Bid
Keystone, CO

North Boulder Library
New Construction - 10,718 SF
Results
Less than $8,000,000 est. value
Boulder, CO 80304

LIBR- East and West Entries - Renovations
Renovation
Post-Bid
$490,000 est. value
Boulder, CO 80302

French Field Press Box Remodel Project
Renovation
Results
$150,000 to $200,000 est. value
Fort Collins, CO 80526

Bus Wash System Project
New Construction
Post-Bid
Westminster, CO

Poudre River Public Library Architectural Design Services
Results
Fort Collins, CO

Standley Lake High School Renovation and Addition
Renovation, Addition
Post-Bid
$5,000,000 to $6,000,000 est. value
Westminster, CO 80021

Architectural Design Services for Clifton Capital Project
Addition
Results
CO

Evergreen Middle School Renovation and General Upgrades
Renovation
Post-Bid
Evergreen, CO 80439

Last Updated 11/11/2021 11:29 AM
Project Title

Reed Library Academic Hub Phase 2

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Education
Sub-Category(s) Library - School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Reed Library Academic Hub, Phase 2 project will renovate approximately 3,400 SF of the southeast area of the main floor of the facility originally constructed in 1967. The project is intended to update and modify the space to continue efforts to centralize academic student support services including Peer Education / Tutoring, Career Services, and Disability Services. Renovation will include selective wall and ceiling demolition, installation of flooring, storefront systems, door replacement, ceiling grid and panels and associated work. The project will prioritize completing the most disruptive activities, such as wall demolition, during the summer semester with construction activities continuing into the fall semester.

Details

Library - School, 3,400 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents