Similar Projects
Construction of Lago Mar Pod 3 Detention, Pod 4 Detention & Channel Revision
Bidding
TX

Phase II Detention Improvements and Mass Grading for Sunset Grove Sections 3, 4, 5, & 6 & Partial Ambrose Section 1 and Ditch 9G Improvements
Bidding
TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX 77591

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Water, Sanitary, and Drainage Facilities in Lago Mar Pod 5 Section 1
Results
Less than $1,096,990 est. value
TX

Landing Ditch Improvements at FM 518
Results
Less than $550,000 est. value
League City, TX

Sedona Section 7 Detention
Bidding
TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

Bacliff Villas Drainage Restoration
Results
Less than $800,000 est. value
Galveston, TX 77550

Reinforced Concrete Pipe, Curb Inlets, Catch Basins, and Joint Sealer Annual Contract
Term Contract
Bidding
Texas City, TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

Legas Drive Bulkhead
Results
$236,169 est. value
Galveston, TX 77550

Deer Ridge Buyout and Overland Flow Improvements
Bidding
$2,700,000 est. value
League City, TX 77573

Highland Bayou Jay Road Ditch Improvements
Post-Bid
$680,000 est. value
Galveston, TX

9th and 11th Avenue Drainage Restoration
Results
Less than $400,000 est. value
Galveston, TX 77550

Reported 02/28/2020 12:00 AM
Project Title

14th Street Ditch Improvements

Physical Address View project details and contacts
City, State (County) Texas City, TX 77590   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Estimate 1,350,000 Includes Add Alternate. The City of Texas City is requesting bids for the 14th Street Ditch Improvements Project. The project involves construction of approximately 8,500 SY of 5” concrete lined ditch along 14th Street from 8th Avenue South, to Loop 197. The project also includes regrading and cleaning of the channel, headwalls, and storm sewer replacement and reconnections. This project also includes one (1) add alternate bid. Add Alternate No. 1 involves construction of approximately 2,900 SY of 5” of concrete lining of the ditch along 14th Street from 8th Avenue South to 4th Avenue South. The add alternate also includes regrading and cleaning of the channel, headwalls, and storm sewer replacement and reconnections.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents