Similar Projects
Misc. Concrete Repair
Bidding
$159,240 est. value
FL

Hilochee Structure Replacement – Phase 1
Term Contract
Results
Less than $230,000 est. value
Lake Alfred, FL 33850

Miscellaneous Construction
Results
Less than $302,422 est. value
FL

Concrete Sidewalks, Driveways and Curbs
Results
Bartow, FL 33831

Sheriff`s Office Garage North Parking Lot - Re-Surfacing
Results
Less than $50,000 est. value
Lakeland, FL 33803

ADA Mat Replacement
Results
Less than $80,000 est. value
FL

Three Parks Trail East New Jersey Road from Turtle Rock Drive to Glendale Street
Results
Lakeland, FL 33803

Polk County BOCC Administration Building Red Parking Lot Resurfacing and Restriping
Results
Less than $205,000 est. value
Bartow, FL 33830

Winter Haven Supervisor of Elections Parking Lot Resurface, Restriping
Results
Less than $60,000 est. value
Winter Haven, FL 33880

Bike Path/Trail/Lighting/Drainage Improvements
Results
Less than $832,392 est. value
Polk City, FL 33868

Ariana Street Sidewalk
Results
Less than $656,854 est. value
Lakeland, FL 33803

Polk County East Government Complex Parking Lots
Results
Less than $85,000 est. value
Bartow, FL 33830

4th Street NW Streetscape and Piazza
Results
$782,000 to $800,000 est. value
Winter Haven, FL 33881

Sidewalk Improvements
Results
Auburndale, FL 33823

Sidewalk Repair and Replacement
Results
Bartow, FL 33830

Last Updated 04/27/2020 09:18 AM
Project Title

Panther Point Trail

Physical Address View project details and contacts
City, State (County) Bartow, FL 33831   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $510,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials and equipment to construct approximately 3.69 miles of stabilized trial. The trail is located on the south shore area of Lake Hancock and construction access will be from Crossover Road.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents