Reported | 02/16/2022 12:00 AM |
Project Title | John Day HVAC Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Rufus, OR 97050 (Sherman County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | John Day HVAC Upgrades: competitive, firm-fixed price (FFP) contract: - Removal/replacement of the existing chiller/heater units - Installation of a new redundant chiller/heater unit to provide backup capacity - Removal/replacement of the existing air handling units located throughout the powerhouse (excludes the main field-fabricated AHU but does includes associated ductwork and piping) - Upgrades for the existing field-fabricated AHU and RF-1 as needed to meet current ventilation, pressurization and control requirements (includes electrostatic filter replacement) - Removal/replacement of the existing pneumatic HVAC controls throughout the powerhouse with new direct digital HVAC controls; installation to include a new front-end system in the powerhouse’s control room to allow overall, instantaneous HVAC system monitoring/control - Installation of new HVAC equipment in the Generator Bays to improve comfort conditions during summer periods - Modification/replacement of existing ventilation equipment throughout the powerhouse (e.g., supply fans, exhaust fans, etc.) as necessary to meet current ventilation/pressurization requirements - Modification/replacement of existing hot/chilled water distribution piping and valves as necessary to satisfy the new HVAC equipment/systems - Replacement/modification of the HVAC systems within the existing administrative office areas to ensure proper heating/cooling, ventilation, and energy efficiency - Integrate new HVAC systems with the existing fire protection systems and controls - Ensure all HVAC systems comply with all applicable life safety mandates - Removal/replacement of existing asbestos/lead-based paint associated with equipment/systems that will be disturbed as part of this project - General demolition requirements associated with equipment, piping, valving, controls, etc. - General phasing requirements associated with the demolition/construction |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |