Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Pedestrian Tunnel Replacement (underneath South Lakeshore Drive) - Lakeshore Park - ENG084 - City of Novi
Alteration
Conception
$507,530 est. value
Novi, MI 48377

Harbor Chase of Farmington Hills
New Construction
Design
$25,000,000 est. value
Farmington Hills, MI 48334

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Design
$2,739,086 CJ est. value
Pleasant Ridge, MI 48069

8 Mile Outlet Conveyance Project Bid Package: Construction
Infrastructure
Bidding
$443,000 CJ est. value
Southfield, MI 48075

Pedestrian Bridges 27, 28 and 40 Replacement
Addition, Demolition, Infrastructure
Bidding
$400,000 CJ est. value
West Bloomfield, MI 48323

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

West Bloomfield Civic Center Emergency Access Drive Project
Results
$143,536 est. value
MI 48323

Cemetery and Volunteer Park Grading Project
Results
$115,000 est. value
South Lyon, MI

Fox Run Continuing Care Center Expansion
Addition - 3,600,600 SF
Construction
$25,000,000 est. value
Novi, MI 48377

Hampton Manor of Holly - Assisted Living Facility
New Construction - 54,530 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Holly, MI 48442

Pella-Dar Townhomes
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Royal Oak, MI 48067

The Delaware
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Royal Oak, MI 48067

Orchard Lake Road Mixed-Use / Keego Harbor
New Construction, Infrastructure - 15,000 SF
Conception
$95,000,000 CJ est. value
Keego Harbor, MI 48320

Last Updated 09/02/2022 11:01 AM
Project Title

Optalis Skilled Nursing Facility

Physical Address View project details and contacts
City, State (County) Farmington Hills, MI 48334   (Oakland County)
Category(s) Heavy and Highway, Medical, Residential
Sub-Category(s) Assisted Living Facility, Hospital, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 100-bed skilled nursing facility on the southern portion of land at 12 Mile Road & Inkster Roads. The project will be adjacent to the townhome development that Robertson Brothers will be developing. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information.

Details

New Construction, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents