Similar Projects
SH-20 - Bridge and Approaches
Infrastructure, Renovation
Design
$2,751,704 CJ est. value
Hominy, OK 74035

SH-20 - Bridge and Approaches
Infrastructure, Renovation
Design
$2,751,704 CJ est. value
Hominy, OK 74035

Contracting Services for the Expansion of an Existing Building
Addition, Demolition, Infrastructure
Bidding
$200,000 CJ est. value
Hominy, OK 74035

Bridge and Approaches - SH 20
Infrastructure
Bidding
$2,316,580 CJ est. value
Hominy, OK 74035

Osage Casino and Hotel / Bartlesville - Roadway Package - Bid Package #2 (Rebid)
Infrastructure
Post-Bid
$40,000,000 est. value
Bartlesville, OK 74003

Grayhorse Sewer Renovations
Infrastructure
Post-Bid
$500,000 CJ est. value
Fairfax, OK 74637

Intersection Modification
Infrastructure
Results
OK

Grade, Drain, and Surface
Infrastructure
Results

Osage Nation - Child Care Facility
New Construction, Infrastructure - 17,328 SF
Pending Verification
$3,750,000 CJ est. value
Pawhuska, OK 74056

Osage Nation - Child Care Facility
New Construction, Infrastructure - 17,328 SF
Pending Verification
$3,750,000 CJ est. value
Pawhuska, OK 74056

SH-20 - Bridge and Approaches
Infrastructure, Renovation
Design
$6,901,907 CJ est. value
Hominy, OK 74035

Water Delivery Pipeline Improvements Project at Salt Creek Crossing for the Grayhorse Village
Infrastructure
Bidding
$500,000 CJ est. value
Fairfax, OK 74637

Construction of a Cement Walking Trail
Infrastructure
Post-Bid
$200,000 CJ est. value
Shidler, OK 74652

Slabjacking and Subsealing Services
Infrastructure
Results

Roads Department Building Osage Nation
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,900,000 CJ est. value
Pawhuska, OK 74056

Last Updated 02/20/2023 03:07 AM
Project Title

Bridge and Approaches - SH 18

Physical Address View project details and contacts
City, State (County) Fairfax, OK 74637   (Osage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $4,932,047 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-18: Over Salt Creek Located 5.3 Mi N Pawnee Cl As of February 20, 2023, the project is in Design status. Anticipated letting month/year is February, 2024. Length : 0.200 Mi. OKDOT - Bridge and Approaches - SH 18 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents