Similar Projects
Electrical Upgrades at Senior Center
Renovation
Sub-Bidding
$145,000 CJ est. value
Saint Charles, MO 63301

Led Sign for Holt High School
Infrastructure
Post-Bid
$80,000 CJ est. value
Wentzville, MO 63385

North Ice Rink Show Lighting System Replacement
Renovation
Post-Bid
$400,000 CJ est. value
Saint Peters, MO 63376

Dark Fiber Network Installation
Term Contract
Results
O Fallon, MO 63366

Material Testing Services-Central School Road and St Peters-Howell Road Traffic Flow Impovements Project
Alteration
Results
Saint Charles, MO 63304

Family Arena LED Displays Purchase and Installation
Renovation
Post-Bid
$1,425,106 CJ est. value
Saint Charles, MO 63303

Traffic Signal Battery Backup Project 2022
Infrastructure
Results
$51,182 CJ est. value
Saint Charles, MO 63301

O'Fallon City Hall Facility Sign Package
Renovation
Post-Bid
$100,000 CJ est. value
Cottleville, MO 63366

Mexico Road at Spencer Road Decorative Streetlight Replacement
Infrastructure
Results
$58,170 CJ est. value
Saint Peters, MO 63376

Portable Generator
Term Contract
Post-Bid
Cottleville, MO 63366

Mid Rivers Mall Drive at Town Center North Signal Repair Project
Infrastructure
Results
$37,882 CJ est. value
Saint Peters, MO 63376

Electrical Control Systems Support Services
Term Contract
Post-Bid
Wentzville, MO 63385

Intersection Conflict Warning System
Infrastructure
Results
$39,400 CJ est. value
Saint Peters, MO 63376

Wrong Way Signing
Infrastructure
Post-Bid
$742,599 CJ est. value
Wentzville, MO 63385

UPS Batteries Replacement
Renovation
Results
$38,765 CJ est. value
Saint Charles, MO 63301

Last Updated 09/27/2023 02:14 PM
Project Title

Frontier Middle School Traffic Signal Installation

Physical Address View project details and contacts
City, State (County) O Fallon, MO 63368   (Saint Charles County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $250,044 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this contract comprises the New Traffic Signal for Frontier Middle School. Construct the work under a stipulated sum contract. Not less than the prevailing hourly wage rates, as determined by the State of Missouri, Division of Labor Standards, shall be paid all workers employed on this project. The Board of Education reserves the right to waive technicalities, to select any contractor filing a proposal, and to reject any or all bids. NO PRE-BID MEETING The Bidder shall carefully examine the drawings, schedules, General Conditions, and specifications and inform himself fully as to all conditions and matters which can in any way affect the work or cost thereof. It is necessary that the Bidder or his representatives visit the site of this project in order to familiarize himself with all phases of the work described herein. Question Deadline 07/28/2023 at 5:00 PM CT. Requests for substitutions of materials must be made in writing. Requests submitted after that date will not be considered. All requests for clarifications to the Architects office shall be submitted in writing The Owner agrees to notify all Bidders as to the disposition of the award of the Contract within sixty (60) calendar days after the filing of bids The Owner reserves the right to accept any, or to reject any or all bids. The Owner reserves the right to enter into negotiations with any Bidder. The Owner reserves the right to make such changes in program or to change and adjust drawings and specifications as may be required to comply with the Owner's budgetary or other requirements. The Owner reserves the right to waive any breach of technicality or alleged technicality. The General Contractor shall provide an outlook construction schedule at each Bi-Weekly construction meeting. The low bidders, General Contractor (or Contractors), shall be available for contractor interviews with the Wentzville School District on Monday, August 14,2023, or Tuesday August 15, 2023, (Time TBD). Each contractor shall provide an outlined project schedule at this interview, outlining their approach to meet the Project Schedule outlined on the Form of Bid In lieu of a cashier's check, a surety company bid bond in the minimum amount of five percent (5%) of the total bid will be acceptable. The bond MUST be on AIA Form A310 to be accepted. The bid bond amount shall cover 5% of the TOTAL CONTRACT amount including performance and payment bond costs. Review Bids: August 14th and 15th Board Packet: August 16th Board Meeting to Award: August 24th Start Project: September 2023 Begin Construction: October 2023 Substantial Completion: April 2024

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents