Similar Projects
World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Water Tank Rehabilitation
Results
$514,000 est. value
Buckingham, VA 23921

Dominion Valley Tank Residual Control System
Results
Woodbridge, VA

Abingdon Water Storage Tank Improvements
Post-Bid
Abingdon, VA 24211

Removal of Water Tank at Roanoke County's Explore Park
Results
$14,885 est. value
Roanoke, VA 24014

Water Tank Maintenance
Term Contract
Post-Bid
Haysi, VA

Airport East Water Storage Tank and Pump Station
Results
$6,100,000 est. value
Hanover, VA 23069

Hydrostatic Test Tank
Post-Bid
Portsmouth, VA 23709

Underground Storage Tank Removal
Results
Fairfax, Oakton, VA 22124

BLRI 2021 Cyclic Water Tank Cleaning
Post-Bid
VA

Water Storage Tank Repair Services
Term Contract
Results
Chesapeake, VA

Cleaning and Inspection of the ACSA's Water Storage Tanks
Post-Bid
Charlottesville, VA

Dean Drive 2.5 MG Water Storage Tank
Results
Less than $1,851,300 est. value
Manassas, VA 20110

Harris Court Tank Rehabilitation Project
Infrastructure
Post-Bid
Mechanicsville, VA 23111

Reported 08/03/2021 11:54 AM
Project Title

Fire Water Tank Repair and Fire Pump Replacement - Buckingham Correctional Center

Physical Address View project details and contacts
City, State (County) Dillwyn, VA   (Buckingham County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as replacement of the firewater pump and repairs to the 100,000 gallon fire water storage tank. Dry interior cleanout, up to 3 inches of sediment. Replace overflow pipe system complete with a weir box on the interior, standoffs every 10 feet on center, an elbow fitted with a flapper valve and screen and a splash pad. Clean, lubricate all moving parts, adjust and calibrate the liquid level gauge Pressure wash exterior with a biodegradable detergent injection - Minimum 1,500 psi at 1.5 gpm. Electrically ground the tank.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents