Similar Projects
2022 Intake Repair Program
Infrastructure
Bidding
Bettendorf, IA

Edgewild Dr Pavement Reconstruction
Infrastructure
Bidding
Davenport, IA 52807

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Pleasant View ES 2022 Access Drive Improvements
Infrastructure
Post-Bid
Bettendorf, IA 52722

Indiana Avenue Friction Seal
Infrastructure
Results
Bettendorf, IA

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

Granular Surfacing of Roadway
Infrastructure
Bidding

Marquette and West 12th Street Replacement
Infrastructure
Results
Davenport, IA

Eldridge SRF Water Quality Improvements - Permeable Pavement Alleyway
Infrastructure
Bidding
Eldridge, IA

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

Emerald Drive Reconstruction
Infrastructure
Results
Davenport, IA 52804

2021 Alley Resurfacing Program
Infrastructure
Results
Davenport, IA

Hickory Grove Road Resurfacing, North Pine Street North to end of HMA overlay
Infrastructure
Results
Davenport, IA 52805

Johnson Avenue Reconstruction (Fairmount to Gayman)
Infrastructure
Results
Davenport, IA 52802

Sewer Lateral Program FY22
Infrastructure
Results
Davenport, IA

Reported 02/16/2022 12:00 AM
Project Title

PCC Patching

Physical Address View project details and contacts
City, State (County) IA   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Mpin-080-6(719)278--0n-82 Route: i-80 Cedar Co Line To Mississippi River 1.00 Each Aprons 118.00 Linear Foot Culvert Pipe 22.00 Cubic Yard Flowable Mortar 53.00 Cubic Yard Granular Backfill 41.00 Each Patches By Count 658.50 Square Yard Patches, Full-Depth Mpin-280-6(705)0--0n-82 Route: i-280 i-80 To Mississippi River 16.00 Each Patches By Count 142.10 Square Yard Patches, Full-Depth

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents