Similar Projects
The Century Center eSports Arena
Results
South Bend, IN 46601

Office & Dance Studio
New Construction
Construction
Crawfordsville, IN 47933

Bendix eSports Arena
Post-Bid
South Bend, IN 46601

Indiana Pacers Field House Renovation Phase 1
Renovation
Construction
$350,000,000 est. value
Indianapolis, IN 46204

Sports Complex
Post-Bid
Madison, IN

Hammond Central High School Bid Package 3 Athletic Fields and Building Demolition
Post-Bid
Hammond, IN 46320

2021 North Side High School Softball Field Improvements
Post-Bid
Fort Wayne, IN 46805

American Muscle Factory Gym
Renovation
Pending Verification
$650,000 est. value
Indianapolis, IN 46214

Halftime Building, Bid Release 1
Post-Bid
New Carlisle, IN

Last Updated 12/29/2020 04:20 PM
Project Title

RFP- Construction Manager As Constructor For Football Half Time Building

Physical Address View project details and contacts
City, State (County) New Carlisle, IN 46552   (Saint Joseph County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 60x168 steel building. Building will be of steel construction with concrete footings and floor. The building will contain 2 locker rooms with showers, coaches offices, trainers room, and officials locker room.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Flooring, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents