Similar Projects
RFP Design - Perry DDA Downtown Lot
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Perry, GA 31069

Houston County Courthouse Parking Lot Expansion
Infrastructure
Bidding
$400,000 CJ est. value
Perry, GA 31069

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Dunbar Road Water Main Extension
Results
Warner Robins, GA 31095

Georgia Avenue Water Main Replacement
Results
$301,800 est. value
Perry, GA 31069

Water System Improvements Phase II to Serve Gilbert Road
Infrastructure
Post-Bid
$750,000 est. value
GA

Water System Improvements Phase 1
Results
Elko, GA 31025

Matt Arthur Elementary Parent Drop Off Improvements
Infrastructure
Post-Bid
Kathleen, GA 31047

Agriculture Meter Installation
Infrastructure
Results

Pine Needle Park Playground
Infrastructure
Post-Bid
$50,000 CJ est. value
Perry, GA 31069

Valve and Meter Boxes
Term Contract
Results
Warner Robins, GA

Bear Branch Remote Well Addition Raw & Potable Water Mains
Infrastructure
Post-Bid
$2,000,000 est. value
Perry, GA

Site Clearing Of Retention Ponds
Alteration
Results
Warner Robins, GA

Downtown Perry Sidewalk Replacement and Pedestrian Lighting
Infrastructure
Post-Bid
$80,000 CJ est. value
Perry, GA 31069

Last Updated 08/01/2022 12:08 PM
Project Title

Parkway Pump Station Influent Sewer and Bypass Pumping Improvements

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $887,725 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 1, 2022. The project has been awarded with the amount of $887,724.75. The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Removal of 1,035 L.F. of 12" gravity sewer main and seven (7) manholes, installation of 1,035 L.F. 24" gravity sewer along with associated manholes and accessories within same alignment. Relocation of the diesel pump and accessories from the Lemley Pump Station to the Parkway Pump Station. The 24" PVC sewer piping will be provided by the City and installed by the Contractor. All other materials will be provided by the Contractor. The time allotted for substantial completion of the work is 120 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 150 consecutive calendar days from the Notice to Proceed. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. Each Bid must be accompanied by a Bid Bond or certified cashier's check, in the amount of 10% of the base bid, prepared on the form of Bid Bond, section 00 04 10, attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570 with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Each Bond shall be accompanied by a "Power of Attorney" empowering the attorney-in-fact to bind the surety and certified to include the date of the bond. Permits Contractor will acquire all necessary Federal, State and local permits preceding the issuance of the Notice to Proceed. Owner has or will acquire all necessary easements and rights-of-way for permanent installations preceding the issuance of the Notice to Proceed. The Owner reserves the right to reject any or all Bids, to waive informalities and to readvertise. Contractor shall supply E-Verify documentation with the bid to be deemed responsive.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents