Similar Projects
Milwaukee - Fond Du Lac Const / Bridge Rehab
Infrastructure
Conception
$14,000,000 CJ est. value
Hartford, WI 53027

Milwaukee - Fond Du Lac Const / Bridge Rehab
Infrastructure
Conception
$14,000,000 CJ est. value
Hartford, WI 53027

Capstone 41 Business Park Phase II and Phase III
New Construction, Infrastructure - 294,600 SF
Design
$316,400,400 CJ est. value
Germantown, WI 53022

N'Dulge Salon
New Construction, Infrastructure - 1,600 SF
Design
$350,000 CJ est. value
West Bend, WI 53095

Install New Sidewalk and Remove and Replace Sidewalk at Various Locations
Infrastructure
Bidding
$100,000 CJ est. value
West Bend, WI 53095

Install New Sidewalk and Remove and Replace Sidewalk at Various Locations
Infrastructure
Bidding
$100,000 CJ est. value
West Bend, WI 53095

2022 Brooklane Drive Phase 2 Utility
Infrastructure
Post-Bid
Kewaskum, WI 53040

2022 Road Program - Town of Erin
Infrastructure
Post-Bid
$450,000 CJ est. value
Erin, WI 53027

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Program
Infrastructure
Results
$230,545 CJ est. value
Erin, WI 53027

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Apple Works Winery Expansion
New Construction, Infrastructure - 600 SF
Pending Verification
$30,000 CJ est. value
Germantown, WI 53022

Apple Works Winery Expansion
New Construction, Infrastructure - 600 SF
Pending Verification
$30,000 CJ est. value
Germantown, WI 53022

S Main Watermain Replacement - 350-15-300 - City of Hartford
Infrastructure
Conception
$374,000 CJ est. value
Hartford, WI 53027

Last Updated 05/16/2023 12:20 PM
Project Title

Farmington Paving

Physical Address View project details and contacts
City, State (County) Farmington, WI 53040   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $290,250 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Farmington is seeking proposals for a qualified contractor to provide Hot Mixed Asphalt Paving services. Proposals are request for the following Town of Farmington, Washington County, WI roads, Pulverize and Repave The scope of work will include a full depth pulverize of the existing pavement, grading, compaction and repaving of 2" hot mix binder asphalt and finished with 2" hot mix surface asphalt material. 1. Scenic Dr- from eastern ROW edge of Forest View Rd extending 2,300 ft east (to first curve east of Forest view) 2. Fillmore Rd- From northern ROW of HWY H extending north to Pioneer Rd. (existing new pavement edge) Asphalt Overlay Roads The scope of work will include a minimum 3/4 inch thick pavement surface shim (hot mix wedge), topped with 2 1/4 in. of surface hot mix asphalt overlay with tack coat. Proposal should include all mill/wedges required to match existing driveways and/or cross road pavements. 1. Scenic Dr- from eastern ROW edge of Forest View Rd extending 2,300 ft east (to first curve east of Forest View) 2. Lakeview Rd. - from eastern property line of 1389 Lakeview Rd to eastern property line of 1275 Lakeview Rd. 3. Fillmore Rd- From northern ROW of HWY H extending north to Pioneer Rd. (existing new pavement edge)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents