Similar Projects
BYU Hinckley Center Remodel
Renovation - 83,793 SF
Post-Bid
Provo, UT 84604

Byu Electrical Vaults Phase 3A
Renovation
Post-Bid
Provo, UT 84602

ME 110 Remodel
Renovation
Results
Orem, UT 84058

UVU PA Annex
Results
Orem, UT 84058

BYU TMCB Interior Renovation
Renovation - 158,696 SF
Construction
Provo, UT 84604

Institutional Residence Remodel
Post-Bid
$207,000 est. value
Orem, UT 84058

Lockhart Locker Room Remodel
Renovation
Results
Orem, UT 84058

HPER Building Nursing Offices
Renovation
Post-Bid
$425,000 est. value
Logan, UT 84322

Remodel Lakemount Manor
Results
Less than $3,100,000 est. value
Orem, UT 84058

Utah Valley University Campus Restroom Remodel
Renovation
Post-Bid
Orem, UT 84058

Lehi Campus Building Remodel
Renovation
Results
$400,000 est. value
Lehi, UT 84058

BYU Harold B Lee Library Concrete Improvements
Renovation
Post-Bid
Provo, UT

Campus Restrooms Remodel
Renovation
Results
Orem, UT 84058

Losee Center 309-311 Remodel
Renovation
Results
$140,000 est. value
Orem, UT 84058

AX 131 and 134 Remodel
Renovation
Results
$100,000 est. value
Orem, UT 84058

Last Updated 08/31/2021 05:32 PM
Project Title

DFCM Construction - UVU Sorensen Student Center Starbucks Tenant Improvement

Physical Address View project details and contacts
City, State (County) Orem, UT 84097   (Utah County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UVU Sorensen Student Center Starbucks Tenant Improvement project includes approximately 1,213 sf of tenant improvement space in the existing student center bookstore and includes a back-of-house workroom (259 sf), serving counter (343 sf) and queuing and seating areas (611 sf). Contractors will be required to maintain pedestrian access to the bookstore which will remain open during the tenant improvement project. Contractors to coordinate with Starbuck’s vendors and installers for equipment, specific finish materials, millwork, and signage. Trades involved include carpentry, metal stud framing and drywall, tile flooring, mechanical (plumbing and HVAC) and electrical.

Details

1 College/University, 1,213 SF New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents