Similar Projects
Mandarin WRF Outfall Stabilization
Infrastructure
Bidding
Jacksonville, FL

Crystal Cove Court Underdrain Repair Project
Post-Bid
Jacksonville, FL

Woolery Drive Drainage Improvements Phase I
Post-Bid
Jacksonville, FL 32211

Roadside Ditch Cleaning and Rehabilitation - Pre-Qualified Horizontal Construction
Term Contract
Results
Less than $1,069,547 est. value
Jacksonville, FL 32202

AASF #1 Erosion Remediation
Results
$325,000 to $400,000 est. value
Jacksonville, FL 32221

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Dredged Material Management Area Du-2 and SJ-1 Shoreline Improvements
Results
Less than $1,467,747 est. value

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Sunbeam Road at Abbey Glen Circle Drainage Improvements
Results
Less than $185,395 est. value
Jacksonville, FL 32202

Springrove Street Drainage Improvements
Infrastructure
Post-Bid
Jacksonville, FL 32209

Duval County Beach Tilling
Results
Less than $49,494 est. value
Jacksonville, FL 32202

Reservoir Lane Underdrain Improvement Project
Results
Less than $99,940 est. value
Jacksonville, FL 32202

Seminole Road Drainage Improvements
Results
Atlantic Beach, FL 32233

Arlington East Water Reclamation Facility Outfall Stabilization
Results
Jacksonville, FL

TMT Rehab Concrete Outfall Pipe at 22+30
Results
Jacksonville, FL

Last Updated 06/18/2021 12:05 PM
Project Title

Isabella Boulevard Drainage Improvements

Physical Address View project details and contacts
City, State (County) Jacksonville Beach, FL 32250   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements include installing stormwater piping and ditch bottom inlets to replace an existing open cut ditch. The new stormwater piping will connect to an existing 42 inch RCP on the downstream end. A new swale will be installed over top of the new stormwater piping.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents