Similar Projects
North Water Reclamation Facility Storage Expansion - 6110880 - Manatee County
Addition, Demolition, Infrastructure
Conception
$453,000 CJ est. value
Palmetto, FL 34221

North Water Reclamation Facility Storage Expansion - 6110880 - Manatee County
Addition, Demolition, Infrastructure
Conception
$453,000 CJ est. value
Palmetto, FL 34221

Lift Stations 1M, 12A, 13A Electrical Rehabilitation
Renovation
Design
$2,716,897 CJ est. value
Bradenton, FL 34205

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Manatee Operations Center Supplemental Crew Contract
Infrastructure
Post-Bid
FL

Riverview Boulevard Water Main Improvements
Infrastructure
Post-Bid
Bradenton, FL 34204

26th Street West at 30th Avenue West Intersection Improvements
Infrastructure
Results
Bradenton, FL 34206

Low Bid Design Build I-275 At Skyway Attenuation
Infrastructure
Results
FL

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Old Bradenton Condominiums
New Construction, Infrastructure
Pending Verification
$7,500,000 CJ est. value
Sarasota, FL 34243

Old Bradenton Condominiums
New Construction, Infrastructure
Pending Verification
$7,500,000 CJ est. value
Sarasota, FL 34243

Harbor Hills Water Main Replacment - 6104270 - Manatee County
Infrastructure
Conception
$1,449,000 CJ est. value
Bradenton, FL 34209

Last Updated 12/08/2022 10:19 AM
Project Title

Bradenton WRF Addition of Fourth Clarifier Plant Modifications Associated with Injection Well

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34208   (Manatee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,334,000 [brand] Estimate
Plans Available from Agency's Affiliate - 09/26/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is generally described as the construction and addition of a fourth clarifier to the City of Bradenton's wastewater system. The work includes, but is not limited to, installation of a 150-foot-diameter clarifier, a return-activated sludge (RAS) pump station, a scum pump station, an electrical building, sludge drying beds, bollards, concrete mow stripping, and associated pipes, valves, fittings, and appurtenances to connect to the existing system. The project also includes modification to the existing clarifier flow splitter box, staircase, and walkway; demolition of any existing piping to accommodate the proposed installations and modifications, the existing aerobic digester, and the dissolved air floatation unit; and removal and replacement of portions of the plant roadway, sludge drying bed, and drainage piping. The work shall be performed as described for a complete and operable system as accepted by the Owner. Other roadway enhancements include removing and installing gravity structures and piping, and associated grading, milling, resurfacing, and paving. All work shall be in accordance with the Construction Drawings, Technical Specifications, and Contract Documents. The project will be funded under the FDEP State Revolving Loan Program and specific requirements under this program are included in the FDEP Supplemental Conditions. Bidders may contact by e-mail Bids@jonesedmunds.com, copying Susan Hochuli, PE (Susan.Hochuli@BradentonFL.gov), for questions, clarifications, and interpretations regarding the Bid Documents. PER ADDENDUM 2: Questions Due: Thursday, November 10, 2022 by 5:00 PM (Local Time)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents