Last Updated 12/06/2019 09:12 AM
Project Title

Davis Brook CSO Storage Tank

Physical Address View project details and contacts
City, State (County) Bangor, ME   (Penobscot County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction of a 3.8 million gallon CSO storage tank with connections to the existing Davis Brook Storage Conduit, integral dewatering pumps with force main and connection to the existing Storage Conduit, and new electrical building as shown on the Drawings and as noted in the Specifications. This work will include erosion control, traffic control, and coordination with the City and utility companies. All work is to be substantially completed by November 30, 2021, and final completion by June 30, 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents