Similar Projects
Last Updated | 06/14/2021 06:52 AM |
Project Title | 2021 - 2023 York CI |
Physical Address | View project details and contacts |
City, State (County) | PA (York County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Part 1 SR3073-003 ECMS #78816. Bridge Replacement. Bridge replacement on SR3073 (Westminster Road) over Indian Run in Penn Township. Anticipated staffing: 1 TCIS. Anticipated duration: 7/19/2021 to 6/20/2022. Part 2 SR0114-031 ECMS #91070. Highway Restoration. Resurfacing of SR0114 (Lewisbury Road) from SR0382 to SR1001 (Poplar Road) in Fairview Township. Overall project length: 2.68 miles. Anticipated staffing: 1 TCIS and 1 TCI. Anticipated duration: 8/09/2021 to 10/01/2022. Part 3 SR0083-096 ECMS #112287. Interstate Maintenance Program. Resurfacing of I-83 from Locust Lane to SR0921 in Manchester Township. Overall project length: 7.24 miles. Anticipated staffing: 1 TCIS, 2 TCIs and 1 TA. Anticipated duration: 8/26/2021 to 9/22/2023. Part 4 SR0616-010 ECMS #108745. 409 Expanded Maintenance. Resurfacing of SR0616 (Main Street) from New Salem Borough line south to the vicinity of Robin Hood Drive in New Salem Borough. Overall project length is <1 mile. Anticipated staffing: 1 TCIS. Anticipated duration: 11/15/2021 to 10/01/2022. Part 5 SR0194-027 ECMS #108743. Highway Restoration. Resurfacing of SR0194 from Creek Road to Franklintown in Franklin and Washington Townships. Overall project length: 4.48 miles. Anticipated staff: 1 TCIS and 1 TCI. Anticipated duration: 12/06/2021 to 9/10/2022. Part 6 SR1031-009 ECMS #113320. 409 Expended Maintenance. Resurfacing of SR1031 (Board Road) from SR0238 (Church Road) to East Crone Road in Manchester Township. Overall project length: <1 mile. Anticipated staffing: 2 TCIs. Anticipated duration: 2/07/2022 to 5/29/2022. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |