Similar Projects
Thermoplastic Line
Post-Bid
Joliet, IL

Construction Variable Width Pavement
Post-Bid
Bolingbrook, IL

Lake Strini Improvements.
Results
Romeoville, IL

RR-21-4563 Veterans Memorial Tollway (I-355) Plaza 99 Spring Creek Modifications
Results
IL

Warehouse(s)
New Construction - 2,000,000 SF
Pending Verification
$10,000,000 CJ est. value
Joliet, IL 60436

S/W Rem. Residential
Post-Bid
Bolingbrook, IL

2021 Resurfacing
Results
Less than $1,000,000 est. value
Lockport, IL

Crackfilling
Post-Bid
Bolingbrook, IL

Ballfield Quad Paving - Four Seasons Park
Results
Plainfield, IL

680 Ton Hot-Mix Asphalt Surface CSE Mix D, N50
Post-Bid
Bolingbrook, IL

Construction Various Width Pavement Resurfacing W/ Hot-Mix Surface Course N50, D-FG (10,580 TON), INCL
Results
Crete, IL

2021 MFT Resurfacing
Post-Bid
New Lenox, IL

JJC City Center Infrastructure Improvements
Results
Joliet, IL 60431

Maintain Streets
Post-Bid
Plainfield, IL

Construction Variable Width Pavement
Results
Less than $1,300,000 est. value
Shorewood, IL

Last Updated 09/21/2022 04:28 PM
Project Title

Wayfair Fulfillment Center - Airport Logistics Center 2 / Romeoville

Physical Address View project details and contacts
City, State (County) Plainfield, IL 60544   (Will County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected July 2021
Bids Due View project details and contacts
Estimated Value $129,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located on 60 acres east of South Weber Road. As of April 14, 2021, no building permits have been issued by The City of Romeoville. An architect and a general contractor have been selected. Construction is expected to begin in the spring of 2021. *Absolutely no inquiries will be accepted by the developer.

Details

1,200,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents