Similar Projects
On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

Water Line at Vernal Memorial Park
Post-Bid
Vernal, UT 84078

Z--Dino - Design/Build, Replace Water Line
Results
$500,000 to $1,000,000 est. value
Jensen, UT 84035

Storm Drain Improvements in Canyon Near Lacey Way
Results
$500,000 to $600,000 est. value
North Salt Lake, UT

Installation of A Storm Drain Line Extension On 200 East
Construction
Enterprise, UT 84725

Culinary Water Improvements
Post-Bid
Less than $700,000 est. value
Levan, UT 84639

Cedar City Air Tanker Base Water Pipe Repair
Results
Less than $25,000 est. value
Cedar City, UT

18” Well Transmission Pipeline Project - Materials Supply
Post-Bid
Hurricane, UT 84737

Bryner Ploutz Pipeline
Results
$50,000 to $100,000 est. value
Helper, UT 55101

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

Construction of the 2019 Fire Flow Projects
Results
UT

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

2019 State Street Waterline Replacement
Results
Less than $1,200,000 est. value
Murray, UT 84107

Last Updated 01/17/2020 11:06 AM
Project Title

2019 Public Works Project

Physical Address View project details and contacts
City, State (County) Hyrum, UT 84319   (Cache County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes expansion of an irrigation pond and grading a berm with excess material. Project also consists of installing a water main along a section of Hollow Ridge Road and water main replacement on 100 West from 200 South to 300 South. This work shall include but not be limited to, associated fittings, valves, water service laterals, installation and replacement of hydrants, road pavement and apparatuses needed to complete construction. The project will also include replacement and installation of storm drain pipe at 275 North 675 West. Work shall include but not be limited to replacement and installation of manholes, catch basins, and road pavement.

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Utility Storm Water Treatment, Catch Basin Insert Utility Storm Water Filters, Storm Drainage Structures, Storm Drainage Manholes, Frames, and Covers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents