Similar Projects
Lyndon Area Arts and Recreation Center
Renovation - 14,400 SF
Conception
Lyndonville, VT 05851

Grand Isle State Park Utility Improvements
Bidding
Grand Isle, VT

Pingree Park Tennis Court Resurfacing
Renovation
Bidding
Londonderry, VT

Grand Isle State Park Playground
Post-Bid
$55,000 est. value
Grand Isle, VT

Alburgh Community Playground Project
Post-Bid
Alburgh, VT 05440

Living Memorial Park Skate Park
Results
Brattleboro, VT 05301

Airport Park Pickleball Courts
Results
Colchester, VT 05446

Community Center, Playground, Child Care and Professional Offices
Renovation
Pending Verification
Pittsford, VT 05763

Dorset Field Club Tennis Court
Renovation
Pending Verification
Dorset, VT 05251

Windham School Playground
Infrastructure
Bidding
Windham, VT 05359

LU Sports Courts
Post-Bid
Hyde Park, VT 05655

Leddy Park Tennis Court Reconstruction
Results
Burlington, VT 05408

Center Street Parklet Decking Construction and Installation
Post-Bid
Rutland, VT

Construction of Slate Quarry Park
Results
$100,000 est. value
Poultney, VT

Tennis Court Resurfacing FY21
New Construction
Post-Bid
Winooski, VT

Last Updated 05/10/2021 08:46 AM
Project Title

Stillwater State Park - RV Dump Station

Physical Address View project details and contacts
City, State (County) Groton, VT 05046   (Caledonia County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $72,844
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is an emergency repair to the existing RV dump station at Stillwater State Park. The existing leachfield has failed and requires remedial action. This projects involves installing two new H20 rated concrete septic tanks with risers to grade, 6” SDR 35 PVC gravity sewer line with appropriate fittings and connections, a new RV dump station and water towers – in a new location from existing, with associated timber, gravel and concrete work, water services, and bituminous pavement cutting, patching and new placement. Utility locating services, turf establishment, erosion control, testing, etc. will all be required as part of this project.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents