Similar Projects
Emerson Hills Apartments
New Construction
Conception
Kannapolis, NC 28083

450 Polo Road
New Construction
Conception
Winston-Salem, NC 27105

The Woodlands At Echo Farms Tract 3C
New Construction - 113,007 SF
Design
$10,000,000 CJ est. value
Wilmington, NC 28412

Farrington Trace
New Construction - 102,718 SF
Design
Greenville, NC

Senior Center East
New Construction
Bidding
Fayetteville, NC 28301

Battleboro Community Center
New Construction - 1,252 SF
Bidding
Less than $500,000 CJ est. value
Rocky Mount, NC 27809

Senior Services of Winston Salem Intergenerational Facility
New Construction - 62,585 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Winston-Salem, NC 27105

Kingsley Park
New Construction
Post-Bid
Fayetteville, NC

Spenga Fitness Studio
Renovation - 4,044 SF
Post-Bid
Chapel Hill, NC 27514

PN 81165 SOF Human Platform FORGE
- 59,500 SF
Results
$25,000,000 to $100,000,000 est. value
Fort Bragg, NC

BB and T Building Wellness Center Renovation Phase 2
New Construction, Renovation
Results
Greensboro, NC 27401

Stockton Pointe
New Construction
Construction
$4,789,135 est. value
Kinston, NC

Davis Drive Apartments
New Construction - 107,950 SF
Construction
$15,000,000 est. value
Morrisville, NC

Crescent Hill Apartments
New Construction
Pending Verification
Arden, NC 28704

Audubon Place - Phase III
New Construction - 28,000 SF
Pending Verification
Arden, NC 28704

Last Updated 04/12/2022 03:47 PM
Project Title

Greensboro Country Club

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27408   (Guilford County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club, Fitness Center
Contracting Method
Project Status Construction Commenced first quarter 2021, Construction Completion Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

52,533 SF - Fitness Center, 7,084 SF Addition, Clubhouse/Social Club, 45,449 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents