Project Title | Old FAA ATCT Sewer Main Repair |
Physical Address | View project details and contacts |
City, State (County) | Hilo, HI 96720 (Hawaii County) |
Category(s) | Heavy and Highway, Sewer and Water, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $50,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replace a portion of the existing sewer main near the old FAA Air Traffic Control Tower at the Hilo International Airport. The scope of work consists of repairing an underground sewer main outside of the old FAA Airport Traffic Control Tower building including excavation. The estimated construction cost is between $25,000 to $50,000. All requests for information shall be received in writing via online prior to the Question Due Date. Questions received after the deadline will not be addressed. Verbal requests for information will not receive a response. The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public. The scope ofwork consists ofrepairing an underground sewer main outside ofthe old FAA Airport Traffic Control Tower building including excavation. The estimated construction cost is between $25,000 to $50,000. Question Due Date in the General Information ofthe HlePRO solicitation. For additional information, contact Mr. Benton Ho, our Airports State Project Manager at (808) 838-8804 or by email at benton.ho@hawaii.gov. The work shall include furnishing all labor, equipment, and materials required to complete the underground sewer pipe repairs determined to be necessary. Reference attached photograph for approximate location. All repairs shall be completed in strict accordance with this section of the Specifications. B. The existing flow in the line segment being replaced shall be controlled whenever necessary during replacement. C. The worksite is located within the Airport Operations Area (AOA). Personnel will be required to obtain the necessary AOA badging in order access the area. Vehicles will also be required to obtain the necessary AOA Construction Pass. Please refer to the Special Provisions |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |