Similar Projects
Reported | 02/05/2020 12:00 AM |
Project Title | Linda Snipes Home Rehabilitation Project Liberty City |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL 33142 (Miami-Dade County) |
Category(s) | Residential |
Sub-Category(s) | Single-Family Homes |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | $39,500 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All repairs and/or installations of new roof system shall comply with requirements of the Miami- Dade County Building Department and The Florida Building Code Test Protocol for High Velocity Hurricane Zones. All valley and eave drip shall be replaced with new and secured with ring shank galvanized nails. Nails shall not penetrate through the sheathing at any visible spot. All plumbing flashing must be replaced with new lead flashing. And, vents and stacks protruding through the roof shall be replaced with new vents or stacks. End joints shall be made over rafters and all eves drip shall be backed with pressure treated 1*2 furring strips. NOTE #1 Include in your price for replacement of any damaged or deteriorated sheathing or framing members. NOTE #2 Contractors are responsible for providing all necessary protection from the weather during all phases of roofing operation. NOTE #3 Contractor is responsible for obtaining a separate plumbing permit for any gas flue vents, and permit must be obtained before the approval of the inspection for the roofing permit. NOTE #4 all materials, installation and inspections shall be in accordance with the Florida Building Code and approved by MDC product control division. Include with your proposal the cost of replacing the first 100 SQ/FT of plywood roof deck |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |