Similar Projects
Clarkston Campus CD Building Install Screw Chiller and Replace AHU Cooling Coil
Post-Bid
Less than $910,000 est. value
Atlanta, GA 30302

Annual HVAC Services Contract
Term Contract
Post-Bid
Valdosta, GA

HVAC Repair
Results
Edison, GA 39846

HVAC Ultraviolet Light UV-C System Installation
Results
Less than $185,220 est. value
Decatur, GA

Annual HVAC Preventative Maintenance Program
Alteration
Post-Bid
Garden City, Pooler, Savannah, Tybee Island, GA 31401

Hephzibah Elementary School HVAC
Results
Less than $808,260 est. value
Hephzibah, GA 30815

APC Data Center Air Conditioner System Project
Alteration
Post-Bid
$264,000 est. value
GA

Vent Hood Cleaning Services - Annual Contract
Term Contract
Results
Less than $23,335 est. value
Jonesboro, GA

Odum Library Fan Array
Alteration
Post-Bid
Valdosta, GA

Replace HVAC-Woodard Gym
Results
Fort Valley, GA

Rome High School Natatorium HVAC Renovation
Alteration
Post-Bid
$500,000 est. value
Rome, GA 30161

Maintenance of Supplemental Cooling Systems
Term Contract
Results
Atlanta, GA 30334

HVAC Maintenance Contract 2021-2023
Term Contract
Post-Bid
Waynesboro, GA 30830

HVAC Systems Cleaning
Alteration
Results
Dublin, Sandersville, GA 31021

Joseph Martin Elementary School HVAC Upgrade
Alteration
Post-Bid
Hinesville, GA 31313

Reported 05/07/2022 12:00 AM
Project Title

Gold Dust Recreation Gymnasium HVAC Project

Physical Address View project details and contacts
City, State (County) Villa Rica, GA 30180   (Carroll County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The project includes to provide well-qualified company to install four 15-ton gas package units in our Recreation department's gymnasium. Currently, there are suspended heaters supplying the gym with heat but there is no means of cooling for this area. There are also two exhaust fans mounted above exterior doors. The gymnasium is 15,120 square feet.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents