Similar Projects
Residential Resurfacing: Area bound by N Santa Fe Ave, N Kelley Ave, NW 50th St and NW 36th St - City of Oklahoma City
Infrastructure
Conception
$2,772,500 est. value
Oklahoma City, OK

Arterial Resurfacing: N May Avenue from NW 63rd St to W Wilshire Boulevard - City of Oklahoma City
Infrastructure
Conception
$1,335,000 est. value
Oklahoma City, OK 73195

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electrical Construction Services at Mike Monroney Aeronautical Center
Alteration
Design
$500 to $1,000,000 est. value
Oklahoma City, OK 73169

Phase II 39th Street District Identification Markers
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Oklahoma City, OK 73105

Led Lighting Conversion Project
Renovation
Sub-Bidding
Oklahoma City, OK 73159

Energy Efficient Lighting
Alteration
Post-Bid
Oklahoma City, OK

Energy Valve Installation
Alteration
Post-Bid
Oklahoma City, OK

J061--Automatic Transfer Switch Maintenance
Alteration
Results
Oklahoma City, OK 73104

Uninterruptible Power Supply Preventive Maintenance
Term Contract
Results
Oklahoma City, OK 73104

Switchgear and Distribution Upgrade
Term Contract
Post-Bid
Oklahoma City, OK 73117

District 3 Facility Generator
Alteration
Results
Oklahoma City, OK 73114

Energy Valve Installation
Alteration
Post-Bid
Oklahoma City, OK

Outdoor Distribution Pad-Mounted Gear
Alteration
Results
Edmond, OK

GNAS Mechanical and Lighting Upgrades
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Last Updated 03/14/2023 03:14 PM
Project Title

Traffic Signal Loop Project

Physical Address View project details and contacts
City, State (County) Edmond, OK 73034   (Oklahoma County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all required materials, supplies, equipment, tools, and plant to perform all necessary labor for the construction of Traffic Signal Loop Replacement Project. All inquiries should be submitted via our bidding system before 2:00 p.m. on March 7, 2023 in case an Addendum is necessary. Anticipated Award Date is March 27, 2023 and Notice To Proceed will be issued on or about March 30, 2023. A cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid shall be required of each bidder. Deposits will be returned to the unsuccessful bidders. The bid bond should be submitted online at the time of online bid submission closing date and time. Each bid submitted is a legal offer and when accepted by the City, constitutes a FIRM AND BINDING CONTRACT. The City reserves the right to REJECT ANY or ALL BIDS. The City of Edmond reserves the unconditional right to cancel all or any portion of this project within thirty (30) days from the date of opening of bids, for any reason and at its sole discretion.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents