Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

Oakmead, Redwood, And Outlet Mall Lift Station Upgrades - C66501923 - City Of Petaluma
Renovation
Conception
$1,800,000 est. value
Petaluma, CA 94952

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Walnut Avenue Pump Station
New Construction
Design
$880,000 est. value
Simi Valley, CA 93063

Pump Station Recovery Mitigation Project
Renovation
Bidding
Long Beach, CA

1.3 MG Fleming Zone 8 Reservoir and Zone 8 to 9 Pump Station
Renovation
Bidding
$13,000,000 est. value
Irvine, CA

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

Add Third Lagoon Pump and Related Infrastructure - SW-03 - City of Foster City
Renovation
Conception
$2,000,000 est. value
Foster City, CA 94404

Pump Station Rehabiliatation - Station 1 - City of Simi Valley
Renovation
Design
$1,600,000 est. value
Simi Valley, CA

Short Term Storage Basins - Pump Station, Earthwork, and Facilities
New Construction
Bidding
$10,500,000 est. value
Firebaugh, CA

Parker Pump Station Replacement
New Construction, Demolition
Post-Bid
$17,400,000 to $19,400,000 est. value
Coronado, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Last Updated 07/13/2022 01:27 AM
Project Title

Bridalveil Fall Comfort Station & Water Supply

Physical Address View project details and contacts
City, State (County) Yosemite Lakes, CA   (Madera County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under this Construction Services project requirement includes – • Construction of a new Comfort Station, associated grading, and site improvements; • Furnish and installation of a water chlorination/electrical prefabricated building and associated appurtenances; Installation of electrical and communication conduits and wires between the new chlorination/electrical building, water tank, and well; • Installation of electrical wire between the new Comfort Station and chlorination/electrical building in existing conduits; • Installation of fiber optic cable between the existing lift station and new chlorination/electrical building; • Installation of a new submersible well pump in a newly constructed well drilled by others; • Furnish and installation of a new bolted steel water tank and associated grading and concrete slab; • Design-Built SCADA system, including control panels and VHF antenna at Bridalveil Fall water system site and Turtleback Dome site; and • Integrate and test the SCADA control system between existing lift station, new water system and Yosemite Valley existing SCADA system

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents