Similar Projects
Hampton Road Booster Pump Station Improvements
New Construction
Bidding
$6,000,000 to $7,000,000 est. value
DeSoto, TX 75123

Kingsborough East Wastewater Treatment Facility 0.42 MGD Phase 1 Early Work Package 01 - Lift Station
New Construction
Bidding
$1,200,000 est. value
Crandall, Dallas, TX 75114

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

Rebuild Chlorine Room at North Main Elevated Storage Tank
Renovation
Post-Bid
$135,000 to $140,000 est. value
Duncanville, TX

World-Wide Water Storage Tank Remediation
Term Contract
Results

Sherwood Wastewater Lift Station & Various Upgrades
Results
Cedar Hill, TX 75104

DeSoto Hampton Road Pump Station
Renovation
Bidding
$6,000,000 to $7,000,000 est. value
DeSoto, TX 75115

Tower Services - Climbing, Repair and Inspection
Term Contract
Post-Bid
Irving, TX

Danieldale Pump Station Rehabilitation - Phase 1 Construction
Results
Duncanville, TX 75137

Terminal D SS Lift Stations
Renovation
Post-Bid
$2,596,645 est. value
Dallas, TX

Walcrest Pump Station and Walnut Hill Pump Station Site and Security Improvements
Results
$1,819,744 est. value
Dallas, TX 75201

Wagon Wheel Elevated Storage Tank Rehabilitation
Infrastructure
Post-Bid
$1,130,000 est. value
Coppell, TX

Holly Elevated Water Storage Tank Rehabilitation
Results
$973,170 est. value
Richardson, TX 75080

Jim Miller Pump Station Improvements
Renovation
Post-Bid
Dallas, TX 75227

Matthew Holzapfel Pump Station
Results
Less than $12,745,860 est. value
Mesquite, TX

Reported 05/25/2022 12:00 AM
Project Title

Hailey Pump Station, Ground Storage Tank Rehabilitation and Site Improvements and Forney-to-Terrell Pump Station Communication Tower

Physical Address View project details and contacts
City, State (County) Mesquite, TX   (Dallas County)
Category(s) Sewer and Water, Tower/Signal System
Sub-Category(s) Lift and Pump Stations, Storage/Water Tanks, Tower/Signal System
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 to $4,000,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a new roof for the existing 1.0 MG ground storage tank, demolition of the existing 0.5 MG ground storage tank, and associated yard valves and piping, and motor and electrical improvements at Hailey Pump Station, and the construction of a communications tower at the Forney-to-Terrell Pump Station

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents