Similar Projects
Major Maintenance and Rehabilitation at Various Water Treatment Plants
Renovation
Bidding
$200,000 est. value
Dallas, TX

Pearland Surface Water Plant
Post-Bid
Less than $100,000,000 est. value
Pearland, TX 77853

AMIS Rehab Water System
Post-Bid
$1,000,000 to $1,500,000 est. value
San Antonio, TX

AST API 653 STI 001 Fuel Removal and Internal Inspection: Ft. Bliss Texas
Results
El Paso, TX

Water Supply Plant No. 2 to Serve Brazoria County
New Construction
Results
TX

Southwest Water Reclamation Facility
Renovation
Pending Verification
League City, TX

Clarifier Drive Replacement
Renovation
Post-Bid
Dallas, TX 75235

Water Treatment Services
Results
$20,000 est. value

Construction of Water Plant No. 1 - Phase 1
Results
$3,900,000 est. value
TX

1.8 MGD Wastewater Treatment Plant Headworks Platform and Ladder
Addition
Results
Katy, TX

Pipeline Odorant System
Infrastructure
Results
Nevada, TX

Sorella Water Supply Plant - Phase 1
New Construction
Results
TX

RWTF WAS Pumps
New Construction
Results
TX

Hickory Groundwater Supply System Expansion - Contract 2 - Treatment Plant Improvements and Well Field Improvements
Renovation, Infrastructure
Results
$35,000,000 est. value
San Angelo, TX

Freedom Park Groundwater Treatment System
New Construction
Results
$1,100,000 to $1,300,000 est. value
Angleton, TX 77515

Reported 05/13/2022 12:00 AM
Project Title

Pine Street SWTP Polymer System and Chemical Storage Tank Improvements

Physical Address View project details and contacts
City, State (County) Beaumont, TX 77725   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,343,800
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of flood protection improvements at the water treatment plant, including, but not limited to: 1. Modifications to the Bulk Chemical Storage Facility including structural expansion, demolition, new storage tanks, pumps, piping, and associated electrical and instrumentation improvements. 2. Replacement of ammonia day tank in Chemical Feed Building. 3. Modifications to the polymer storage and feed system including demolition of existing storage drums and scales, replacement of feed pumps, and addition of flow meters, and associated piping, electrical, and instrumentation improvements. 4. Ramp modifications at Chemical Feed Building.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents