Similar Projects
Backwash Pump Replacement at 2A Water Treatment Plant
Bidding
Pompano Beach, FL 33064

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Mechanical Integrity Testing for Deep Injection Wells
Results
Miramar, FL 33027

Supply and Delivery of Two (2) Split Case Horizontal Pumps
Results
Plantation, FL 33317

Mechanical Integrity Testing (MIT), Sawgrass Water Treatment Plant (WTP) Concentrate Well CW1
Results
Sunrise, FL

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Access Structure and Wetwell Rehabilitation - Term Contract
Term Contract
Results
Plantation, FL

Supply and Delivery of Well Pump
Results
Plantation, FL 33317

Raw Water Well #9
Results
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
Less than $175,000 est. value
Fort Lauderdale, FL 33301

Irrigation Pump Control Upgrade to VFD
Results
Weston, FL

Pool Pumps
Results
Lauderhill, FL 33311

Reverse Osmosis Membrane Feed Pump and Motor
Results
Less than $275,000 est. value
Davie, FL 33314

Peele-Dixie Water Treatment Plant Injection Well Mechanical Integrity Test
Results
Fort Lauderdale, FL 33317

Reported 05/11/2021 11:13 AM
Project Title

By-Pass Pumps Maintenance

Physical Address View project details and contacts
City, State (County) Davie, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide maintenance and repair services to the Town of Davie Utilities Department trailer mounted portable by-pass pumps (hereafter called pumps). Maintenance and service includes the following: inspections, testing, repairs and emergency services. All services performed will be to ensure that the Town’s pumps are operating efficiently and effectively according to the manufacturer’s standards. The contract would include both scheduled as well as “as needed” and emergency basis maintenance and service.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents