Similar Projects
Manhole Covers and Locking Device Assembly - CIP Project
Infrastructure
Bidding
$250,000 CJ est. value
Los Angeles, CA 90012

As Needed Plumbing Maintenance and Repair for Met In-Town Housing (Multiple Locations)
Alteration
Post-Bid
$240,000 est. value
Los Angeles, CA 90012

As Needed Plumbing Maintenance and Repair for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract, Alteration
Post-Bid
$240,000 est. value
Desert Center, Los Angeles, CA 90012

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Waste and Vent Lines Re-Pipe
Alteration
Results
$25,000 est. value
Los Angeles, CA

As Needed Plumbing Maintenance and Repair for Metropolitan's Iron Mountain Pumping Pump Plant Housing
Term Contract
Post-Bid
$240,000 est. value
Los Angeles, CA

Plumbing Services - Los Angeles and Ventura County
Term Contract
Results
$1,155,852 CJ est. value
Los Angeles, CA 90012

Walnut Park - Water Meter Replacement Project
Infrastructure
Post-Bid
$1,600,000 CJ est. value
Huntington Park, CA 90255

District 22 Trunk Sewers Group 1 Rehabilitation
Infrastructure
Results
$1,970,379 CJ est. value
Glendora, CA 91741

As-Needed Plumbing Repair Services for Metropolitan's Hinds Pumping Pump Plant Housing
Term Contract
Post-Bid
Less than $95,000 est. value
Los Angeles, CA

North Inglewood Booster Pump 3 Replacement Project
Renovation
Results
$74,000 CJ est. value
Inglewood, CA 90302

As-Needed Plumbing Repair Services for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract
Post-Bid
Los Angeles, CA

Ben Lomond Trunk Sewer Rehabilitation
Infrastructure
Results
$2,196,752 CJ est. value
Covina, CA 91723

Marina Manor Senior Public Housing Development Buildings I and II Pipe Coating Project
Alteration
Post-Bid
$2,000,000 est. value
Marina del Rey, CA 90292

Main Street, Fourth Street, And Mission Road Sewer Main Replacement Project - Phase 1
Infrastructure
Results
$3,291,245 CJ est. value
Alhambra, CA 91801

Last Updated 06/19/2023 04:32 PM
Project Title

Fire Station 14 Workforce Privacy Project

Physical Address View project details and contacts
City, State (County) Long Beach, CA 90803   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Construction start expected December 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $53,425 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of June 19,2023, all bids rejected. No definite date for the rebid.** The Work for the Long Beach Fire Department Station 14 consists of interior improvements to meet required gender accommodations and accessibility improvements. Scope includes the renovation of existing second floor office, gym, sleeping areas, restrooms into an office, laundry room, private sleeping rooms, and private restrooms. Reconfigure the first floor Captain's Dormitory and restroom into two (2) dormitory rooms and accessible restrooms. Refurbish and redecorate existing and new restrooms with new plumbing fixtures, flooring, wall and ceiling finishes. Plumbing, HVAC and electrical systems will be upgraded, refurbished or added to as appropriate. Additional building improvements include a new roof, new windows/infill existing windows, new smoke alarm system, Fire Station alerting system, telephone, cable TV, and communications systems. Site improvements include revisions to existing parking, sidewalk/hardscape, entry door hardware, improvements to the storm drain lines and systems, and accessibility signage. Bids are required for the entire Work indicated on the Drawings and Specifications. SMALL BUSINESS ENTERPRISE (SBE) PROGRAM: Bidders are advised that this project is subject to the City's SBE Program. See Divisions C and E of the Specifications. PROJECT LABOR AGREEMENT: This Work is covered by a Citywide Project Labor Agreement (PLA) entered into by the City of Long Beach with the Los Angeles/Orange Counties Building and Construction Trades Council and the signatory Craft Unions. The PLA establishes the labor relations Policies and Procedures for the City, the Contractor and subcontractors awarded contracts for the Work and for the craft persons employed by the Contractor or subcontractor while engaged in the Work. See Division E of the specifications for the applicable PLA. CONTRACTOR'S LICENSE: The Contractor shall possess a valid California Class A or B Contractor license at the time of contract award. The combined LBSBE goal for this bid is: 5.93% For any questions or request for information (RFI), please send to michelle.harati@haratisolutions.com

Details

2 Stories Above Grade, 8,820 SF.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents