Similar Projects
Terminal Area Expansion Grading and Drainage Phase 1A
Post-Bid
Dallas, GA 30157

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Agriculture Meter Installation
Infrastructure
Results

Transfer Station Scale House
New Construction, Infrastructure
Results
Dallas, GA 30132

Northeast Water Transmission Main
Infrastructure
Results
$269,596 est. value
GA

Material Bid for Magnolia Pointe Water Improvements
Infrastructure
Post-Bid
GA

SR 92 North Water and Sanitary Sewer Relocation
Infrastructure
Results
$768,750 est. value
GA

Buchanan Highway Water Main Extension
Infrastructure
Results
$500,000 est. value
Dallas, GA 30132

Demolition and Reconstruction of Pavilion/Bathroom
Demolition, New Construction, Infrastructure
Results
$751,308 CJ est. value
Dallas, GA 30157

RFP Construction Manager at Risk - Burnt Hickory Elementary School and North Paulding High School
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Dallas, GA 30132

2022 - Parking Lot Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Hiram, GA 30141

2023 Asphalt Bituminous Surface Treatment Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Dallas, GA 30132

CR 591 / Morningside Dr at Mill Creek / Lick Log Creek S of Hiram
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Dallas, GA 30132

Burnt Hickory Park Pickleball Courts
Infrastructure
Bidding
$500,000 CJ est. value
Dallas, GA 30132

Caliber Collision / Hiram
New Construction, Infrastructure - 16,413 SF
Bidding
$5,000,000 CJ est. value
Hiram, GA 30141

Last Updated 09/23/2022 12:41 PM
Project Title

2022 - Arnold Lane (Water Main)

Physical Address View project details and contacts
City, State (County) Hiram, GA 30141   (Paulding County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $908,251 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The OWNER of the project is the City of Hiram. The Engineer/Architect for the project is Rindt-McDuff Associates, Inc. The approximate extent and character of the Work is generally described as follows: This project involves upgrading the water main system and existing connections on Arnold Lane Bidders shall inform themselves concerning Georgia Laws and comply with same. The time allowed for Substantial Completion is 60–90 days from the date of notice to proceed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents