Similar Projects
Various Electrical Services
Results
Flint, MI

Statewide Generator Maintenance Contract
Alteration
Results
Corunna, East Lansing, Flint, Grand Ledge, Grand Rapids, Lansing, Saginaw, Williamston, MI 48837

KMS Apartments Bathroom Renovations and River Park Apartments Site Lighting Improvement Project
Renovation, Alteration
Post-Bid
Flint, MI

Reid Elementary Infrastructure Upgrades
Alteration
Post-Bid
Goodrich, MI 48438

Electric Room Upgrade/Generator Installation
Renovation, Alteration
Results
Flint, MI 48503

Remodel of Existing Entries, Boiler and Mechanical Unit Replacement Electrical Work.
Alteration
Post-Bid
Genesee, MI 48437

Athletic Complex South Concessions Building - Electrical (Rebid)
Renovation
Post-Bid
$400,000 CJ est. value
Grand Blanc, MI 48439

AMI Meters
Alteration
Post-Bid
Flint, MI

Stadium Lights Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Flint, MI 48505

Switchgear Maintenance
Term Contract
Post-Bid
Flint, MI 48502

Kearsley Community Schools District-wide Classroom Electrical Upgrades
Renovation
Results
$118,600 CJ est. value
Flint, MI 48502

Camera System Upgrades
Renovation
Post-Bid
$6,500 CJ est. value
Grand Blanc, MI 48439

Network Infrastructure at Genesee County Jail
Renovation
Post-Bid
$400,000 CJ est. value
Flint, MI 48502

AED Equipment and Supplies
Renovation
Sub-Bidding
$240,000 CJ est. value
Flint, MI 48502

Upgrade Building Backup Generator at the Marion Crouse Instructional Center
Renovation
Sub-Bidding
$60,000 CJ est. value
Flushing, MI 48433

Last Updated 01/10/2023 03:35 PM
Project Title

ructured Cabling, PA/Clock, and Classroom A

Physical Address View project details and contacts
City, State (County) Fenton, MI 48430   (Genesee County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $115,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of Forest Hills Public Schools (hereinafter referred to as the "District") to solicit proposals from qualified vendors for structured cabling, PA and clocks, and classroom and conference room AV. This solution will consist of the following components: equipment, installation services, warranty services. This incorporates three buildings: Administration Building addition, Ada Vista Elementary (Ada Vista), and Pine Ridge Elementary (Pine Ridge). The Administration Building is a newly constructed addition to the existing Fine Arts building that will require the entire scope of work noted in this Request for Proposals (RFP). Ada Vista and Pine Ridge will remain at existing building locations and only require structured cabling and removal/reinstall of wireless APs and classroom AV. Vendors' pricing should be based on initial buildings, with a unit cost commitment for future cabling projects at other schools in the District. The additional buildings may be awarded in the future at the District's discretion. Ada Vista Spring 2023 to October 2024. Phased Structured cabling Removal/reinstall of wireless APs Removal/reinstall of classroom AV (projectors, audio system including speakers) Pine Ridge Summer 2023 to October 2024. Phased Structured cabling Removal/reinstall of wireless APs Removal/reinstall of classroom AV (projectors, audio system including speakers) Administration Building Addition Spring 2023 to October 2024. Phased Structured cabling PA system Classroom AV Conference room / office AV Removal/Reinstallation of access points Deadline for submittals of questions related to this RFP 12/9/2022 Anticipated award date February 2023 Implementation schedule Administration Building: Spring 2023 to October 2024 Ada Vista Elementary: Spring 2023 to October 2024 Pine Ridge Elementary: Summer 2023 to October 2024 Each vendor that intends to submit a proposal in response to this RFP should communicate its intent via email to gina.mancinelli@plantemoran.com Requests for clarification shall be submitted by email only to: Shae Sultes Shae.Sultes@plantemoran.com Every bid shall be accompanied by either a cashier's check on a solvent bank or by a bond executed by a surety company authorized to do business in the state of Michigan. A 5% bid bond or cashier's check shall be required. Such check or bond shall name the District as recipient. The amount of such bid bond or cashier's check shall be forfeited as liquidated damages, costs, and expenses incurred by the District if the Vendor, after given an award as successful vendor, shall fail within 30 days after the notice of such award to enter into an appropriate contract with the District. The District MAY require the selected vendor(s) to provide a performance bond upon award of the contract. The associated cost of the performance bond is to be shown as a separate line item -- do NOT include this cost in your base bid. This bond shall be equal in amount to the total price to the District of purchased hardware, software, cabling, and services. The surety of the bond shall remain in effect for one year after all acceptance of the entire project has been executed by the District. In the event that the Vendor(s) fails to perform its obligations under any agreement between the Vendor(s) and the District, the bond shall be paid to the District. The Vendor(s) further agrees to save and hold harmless the District and agents from all liability and damages of every description in connection with any subsequent agreements. Payment bonds shall be required under the following conditions: project award exceeds $50,000 and the project involves construction, alteration, or repair to the buildings.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents