Similar Projects
Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Sunfield Phase 3 Section 6A Street, Drainage, Water, Wastewater, and Utility Improvements, The Sunfield Phase 3 Section 6B Street, Drainage, Water, Wastewater, and Utility Improvements; Sunfield Phase
Post-Bid
Buda, TX

Trails at Windy Hill Phase 2
Results
TX

Meadows at Buda, Wastewater Improvements
Results
Less than $181,760 est. value
Buda, TX 78610

Sunfield Phase 3 Section 5C Street Improvements and Sunfield Phase 3 Section 5C Drainage, Water, Wastewater, and Utility Improvements
Post-Bid
TX

Zorn Standpipe Rehabilitation Project
Results
Less than $330,000 est. value
San Marcos, TX 78666

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Post-Bid
Dripping Springs, TX 78620

Sunfield Phase 4 Section 3A Utilities Improvements
Results
Buda, TX 78610

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Trails at Windy Hill Phase Four and Five Paving, Drainage, Water and Wastewater Improvements
Results
TX

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Bunton Creek Interceptor Phase 2.0
Results
$3,000,000 to $4,000,000 est. value
Kyle, TX 78640

Driftwood Phase 1 Section 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

City of Kyle - Elliott Branch Wastewater Interceptor
Results
Less than $6,100,000 est. value
Kyle, TX 78640

Central Wimberley Wastewater Project
Post-Bid
Wimberley, TX

Last Updated 10/14/2020 08:29 AM
Project Title

Caliterra Phase 4 Section 11

Physical Address View project details and contacts
City, State (County) Dripping Springs, TX 78620   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of Streets, Drainage, Water, Wastewater and Erosion Control Improvements (the “Project”).

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents