Kwik Trip / Reedsburg
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Reedsburg, WI 53959

CTH G - STH 23 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Plain, WI 53577

J's Pub and Grill - Outside Addition
Addition, Renovation, Infrastructure
Design
$100,000 CJ est. value
Reedsburg, WI 53959

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Village Forest Park Project - Playground Development
Infrastructure - 2,500 SF
Post-Bid
$540,000 CJ est. value
Baraboo, WI 53913

Baraboo and Reedsburg Facilities
New Construction, Infrastructure - 164,640 SF
Results
$10,000,000 CJ est. value
Baraboo, Reedsburg, WI 53913

2022 Street and Utility Improvements
Infrastructure
Results
Baraboo, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pelton Apartments
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Reedsburg, WI 53959

Baraboo VA Outpatient Clinic
New Construction, Infrastructure - 11,300 SF
Pending Verification
$7,000,000 CJ est. value
Baraboo, WI 53913

Mineral Point - Spring Green Const / Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Loganville, WI 53943

Bluff View Condominiums
New Construction, Infrastructure
Post-Bid
$32,000,000 CJ est. value
Baraboo, WI 53913

2022 Laurel Street Reconstruction
Infrastructure
Results
Reedsburg, WI 53959

Last Updated 04/14/2023 06:34 PM
Project Title

Wastewater Treatment Facility Chemical Feed Systems Village of Rock Springs

Physical Address View project details and contacts
City, State (County) Rock Springs, WI 53961   (Sauk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $287,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: the installation of a prefabricated fiberglass building, chemical feed systems, site piping, manhole rehabilitation, and electrical work. The anticipated substantial completion date is December 31, 2023 and final completion date is June 14, 2024. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1230 South Boulevard, Baraboo, WI 53913The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents