Similar Projects
Homestead Phase Four
New Construction, Infrastructure - 7,900 SF
Conception
$80,000,000 CJ est. value
Logan, UT 84321

Foreign-Language Center - Utah State University
New Construction, Infrastructure
Design
$14,500,000 CJ est. value
Logan, UT 84321

Logan Meadows Business Park
New Construction, Infrastructure - 83,560 SF
Design
$12,300,000 CJ est. value
Logan, UT 84321

Blackstone Headquarters / Providence
New Construction, Infrastructure - 85,000 SF
Bidding
$22,000,000 CJ est. value
Providence, UT 84332

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Spring Water Metering Vault 2021
Infrastructure
Post-Bid
Providence, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

100 West Corridor Construction
Infrastructure
Results
Logan, UT

Quarter Circle Drive Canal Piping Project 2021
Alteration
Construction
Nibley, UT 84321

Berntson Estates Residential Subdivision
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84341

100 West Executive Suites
Demolition, New Construction, Infrastructure - 80,920 SF
Pending Verification
$24,400,000 CJ est. value
Logan, UT 84321

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

North Valley Landfill Drain Net Installation V2
Infrastructure
Results
$68,020 CJ est. value
Logan, UT 84321

Deep Canyon Trailhead - Cache County
Infrastructure
Pending Verification
$760,000 CJ est. value
Mendon, UT 84325

Cemetery Phase II
Infrastructure, Alteration
Post-Bid
River Heights, UT 84321

Last Updated 02/07/2023 08:07 PM
Project Title

Construction of the Bridgerland Water Improvements

Physical Address View project details and contacts
City, State (County) North Logan, UT 84341   (Cache County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $769,171 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of Feb 7 the project has not yet been awarded. A timeline for award has not yet been established . Separate sealed bids for construction of the Bridgerland Water Improvements will be received by Bridgerland Water Company from bidders. The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS Connect the existing Bridgerland Water Company system to the Garden City Culinary Water system using an existing, previously installed 4"PVC pipe connected to two new pump houses to convey that water to an existing storage tank. Also, install a new pump house to replace an existing boosterpump connecting a spring near Hodges canyon to the same existing storage tank This project is funded by Utah Division of Drinking Water State Revolving Fund. This is a federally funded project. All bidders are required to make the six good faith efforts to assure compliance with the State's "fair share goals" and are required to comply with EEO regulations.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents