Similar Projects
Last Updated | 02/07/2023 08:07 PM |
Project Title | Construction of the Bridgerland Water Improvements |
Physical Address | View project details and contacts |
City, State (County) | North Logan, UT 84341 (Cache County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $769,171 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of Feb 7 the project has not yet been awarded. A timeline for award has not yet been established . Separate sealed bids for construction of the Bridgerland Water Improvements will be received by Bridgerland Water Company from bidders. The work to be performed under this project shall consist of furnishing all labor, materials and equipment required to construct the facilities and features called for by the CONTRACT DOCUMENTS and as shown on the DRAWINGS Connect the existing Bridgerland Water Company system to the Garden City Culinary Water system using an existing, previously installed 4"PVC pipe connected to two new pump houses to convey that water to an existing storage tank. Also, install a new pump house to replace an existing boosterpump connecting a spring near Hodges canyon to the same existing storage tank This project is funded by Utah Division of Drinking Water State Revolving Fund. This is a federally funded project. All bidders are required to make the six good faith efforts to assure compliance with the State's "fair share goals" and are required to comply with EEO regulations. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |