Similar Projects
Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Life Time Athletic Resort / Castle Pines
New Construction, Infrastructure - 115,000 SF
Design
$30,000,000 CJ est. value
Castle Pines, CO 80108

Jordan Road - Parkerhouse Road Traffic Signal
Infrastructure
Bidding
$451,440 CJ est. value
Parker, CO 80134

RFQ - Invitation to Provide Statement of Qualification Castle Rock Reservoir No. 1 and 2
Infrastructure
Bidding
$13,560,000 CJ est. value
Sedalia, CO 80135

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

2021 Woodmoor Mountain Road Project
Infrastructure
Post-Bid
CO

2021 Street Overlay
Results
Lone Tree, CO

2021 Concrete Replacement
Results
Less than $432,109 est. value
Lone Tree, CO

Apex Meridian Phase II
New Construction - 180,000 SF
Construction
$10,000,000 est. value
Lone Tree, CO

Aspen View Academy
New Construction, Addition - 21,000 SF
Construction
$2,000,000 to $2,500,000 est. value
Castle Rock, CO

Stem School And Academy Addition And Renovation
Renovation - 10,400 SF
Pending Verification
Highlands Ranch, CO 80129

Stem School And Academy Addition And Renovation
Renovation - 10,400 SF
Pending Verification
Highlands Ranch, CO 80129

Millers Landing Hotel
New Construction, Infrastructure
Design
$89,500,000 CJ est. value
Castle Rock, CO 80104

Pronghorn Park and Disc Golf Course
Infrastructure
Bidding
$650,000 CJ est. value
Castle Pines, CO 80108

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

Last Updated 10/19/2022 01:35 PM
Project Title

RFQ Contractor - Construction Manager/General Contractor (CM/GC)

Physical Address View project details and contacts
City, State (County) Castle Rock, CO 80104   (Douglas County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Intent Not Available Question Acceptance Deadline 04/15/2022 06:00 PM EDT Questions are submitted online Yes DOUGLAS COUNTY SCHOOL DISTRICT RE.1 (DCSD) is requesting pre-qualification submittals from interested CM/GCs for Capital Improvement Projects with a construction cost range up to $3M+. These projects may include, but are not limited to, repairs and replacements of mechanical, electrical, plumbing, roofing, and flooring building components, athletic site amenities, as well as site landscaping, concrete, and asphalt. General Requirements - Insurance Required - Contractors License Required - Employee Background Checks Required - Security Badges All costs incurred with material preparation and submission in response to this RFQ are the responsibility of the applicant. Submission of incomplete data or material received after the stated deadline will constitute disqualification. The school district reserves the right to reject any firm responding to this RFQ. It is the intent of DCSD to review submitted information and establish a list of pre-qualified CM/GCs. The final pre-qualified list will be published on online. Firms that are currently pre-qualified and in good standing with DCSD, will only need to submit the Contact Information Form, which can be emailed directly to Kelly Kalcevic at kelly.kalcevic@dcsdk12.org.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents