Similar Projects
Remove and Replace PCC Surfacing, Replace Str Bridge, Approach Grading, Correct Clearance Deficiency, Spot Grading, Pipe Work
Demolition, New Construction, Infrastructure
Conception
$36,167,000 CJ est. value
Canistota, SD 57012

Remove and Replace PCC Surfacing, Replace Str Bridge, Approach Grading, Correct Clearance Deficiency, Spot Grading, Pipe Work
Demolition, New Construction, Infrastructure
Conception
$36,167,000 CJ est. value
Canistota, SD 57012

Structure Replacement and Approach Grading
Demolition, New Construction, Infrastructure
Bidding
$2,600,000 CJ est. value
Spencer, SD 57374

Structure Replacement and Approach Grading
Demolition, New Construction, Infrastructure
Bidding
$2,600,000 CJ est. value
Spencer, SD 57374

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Interstate Cross Road Improvements, C and G, Sidewalk and Gravity Retaining Wall
Infrastructure
Results

LSDC Overlay, Joints
Infrastructure
Conception
$416,000 CJ est. value
Canistota, SD 57012

Remove and Replace PCC Pavement
New Construction, Infrastructure
Post-Bid
SD

Cold Milling Asphalt Concrete, Asphalt Concrete Resurfacing (26K Ton), Pipe Work
Infrastructure
Results
SD

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Asphalt Surface Treatment
Infrastructure
Results

Various Materials
Renovation, Infrastructure
Post-Bid
SD

Spot Cold Milling and Spot Asphalt Concrete Resurfacing of Shoulders
Infrastructure
Results

Last Updated 01/05/2023 03:34 AM
Project Title

Mill, AC Resurfacing, Pipe Work

Physical Address View project details and contacts
City, State (County) Salem, SD 57058   (McCook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $6,725,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD38 - Fm US81 to SD19; Jct of SD19/SD38. Length : 16.6 As of January 05, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill, AC Resurfacing, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents