Similar Projects
554-21-121 Replace Heat Pumps In CBS With Fan Coils
Term Contract
Design
$250,000 to $500,000 est. value
Aurora, CO 80045

Replace HVAC Systems, Platte Valley
Renovation
Design
$1,549,000 CJ est. value
Centennial, CO 80112

ARTF HVAC Systems Separation Project
Renovation
Sub-Bidding
$300,000 CJ est. value
Avon, CO 81620

UCB000510-MULTI-NTCT-Boiler Replacement R and R-Phase 1.
Renovation
Sub-Bidding
$190,000 CJ est. value
Boulder, CO 80302

Installation of An Air Conditioning Unit in Our Base in San Luis
Alteration
Post-Bid
San Luis, CO

HVAC Heat Pump System
Alteration
Post-Bid
Delta, CO

Remove and Install Air Handling Units at Sheriff`s Office
Alteration
Results
Colorado Springs, CO 80903

SWLL-Maintenance
Alteration
Results
$2,401,658 est. value
Boulder, CO

Grant Ranch Chiller Replacement
Renovation
Construction
$500,000 CJ est. value
Littleton, CO 80123

Grant Ranch Chiller Replacement
Renovation
Construction
$500,000 CJ est. value
Littleton, CO 80123

Corsican Apartments Boiler Replacement
Renovation
Design
$5,000,000 CJ est. value
Denver, CO 80206

Community Center HVAC Roof Top Unit Replacement
Alteration
Post-Bid
Black Hawk, CO

F--Air Duct Cleaning BPA
Term Contract
Results
Boulder, CO - Las Vegas, NV

Greenwood Chiller Replacement
Renovation
Construction
$300,000 CJ est. value
Denver, CO 80239

Pioneers Museum HVAC System Installation
Alteration
Post-Bid
Colorado Springs, CO 80903

Last Updated 07/24/2023 11:04 AM
Project Title

City Hall HVAC Improvements

Physical Address View project details and contacts
City, State (County) Woodland Park, CO 80863   (Teller County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000324063 The City of Woodland Park would like to request a rough order of magnitude cost for engineering design, construction, and installation for HVAC improvements at City Hall at 220 W South Ave in Woodland Park, CO. The cost will be used for planning the 2024 budget with a target for construction in 2024/2025. The HVAC improvements will consist of a new gas/electric hybrid system and adding air conditioning to the building. There is limited as-built information for the building but the plan set for another project taking place at City Hall is inlcuded in the bid documents showing the layout of the building. Question Acceptance Deadline 07/26/2023 at 5:00 PM MT Questions are submitted online Yes

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents