Last Updated | 02/28/2023 03:43 PM |
Project Title | Replace and Install Eleven (11) Water Source Heat Pumps for the Jefferson Parish Correctional Center |
Physical Address | View project details and contacts |
City, State (County) | Gretna, LA 70053 (Jefferson County) |
Category(s) | Government/Public |
Sub-Category(s) | Prison/Jail |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Labor & Materials Necessary to Remove, Replace & Install eleven (11) water source heat pumps for the Jefferson Parish Correctional Center We extend this proposal to provide labor, materials, equipment, transportation, and all other incidentals necessary to remove eleven (11) existing Water Source Heat Pump(s) and supply and install eleven (11) new Trane Standard Efficiency Water Source Heat Pump(s) or owner reviewed and approved equal systems at the Jefferson Parish Correctional Center located at 100 Dolhonde Street, Gretna, LA 70053. License(s) issued by the Louisiana State Licensing Board for Contractors: Mechanical Statewide Failure to comply will cause the bid to be rejected. The license number must be entered in the appropriate field in the electronic procurement system. o Surety Bond: An Electronic bid bond will be required with bid submission in the amount of 5% of the total bid. The vendor shall indicate the electronic bid bond number in the location specified on the electronic bid envelope. No scanned paper copies of any bid bond will be accepted as part of the electronic bid submission. o Performance Bond: A Performance Bond in the amount of 100% of the total contract price will be required. The performance bond shall be produced upon contract execution. o Payment Bond: A Payment Bond in the amount of 50% of the total contract price will be required. The payment bond shall be produced upon contract execution. We extend this proposal to provide labor, materials, equipment, transportation, and all other incidentals necessary to remove eleven (11) existing Water Source Heat Pump(s) and supply and install eleven (11) new Trane Standard Efficiency Water Source Heat Pump(s) or owner reviewed and approved equal systems at the Jefferson Parish Correctional Center located at 100 Dolhonde Street, Gretna, LA 70053. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |