Similar Projects
Rolling Hills New Building Facilities
New Construction
Conception
$42,000,000 est. value
Byesville, OH

Amphitheater Construction
New Construction, Infrastructure
Conception
Cadiz, OH 43907

School Facilities Projects Phase 2
New Construction - 400,000 SF
Design
Less than $250,000,000 est. value
Gahanna, OH

Tusky Valley PK-6 Middle School Conversion
Renovation, Addition - 101,215 SF
Design
$17,700,000 est. value
Bolivar, Zoar, OH 44612

Construction Manager at Risk Services for School Construction
New Construction
Bidding
Wadsworth, OH

Millcreek-West Unity Local School Gymnasium Addition
Addition - 77,484 SF
Bidding
West Unity, OH 43570

Firelands High School
New Construction - 106,643 SF
Post-Bid
$23,000,000 est. value
South Amherst, OH 44001

Notice of request for qualifications for construction manager at risk for Indian Hill Exempted Village School District Board
Post-Bid
$77,000,000 to $82,000,000 est. value
Cincinnati, OH 45243

Northview High School Wellness Center Addition Project
Addition
Results
Less than $1,716,000 est. value
Sylvania, OH 43560

CMR Services for Two New Elementary Schools and a Middle School
New Construction
Results
Less than $94,000,000 est. value
Lewis Center, OH

St. Martin de Porres High School - Phase II
New Construction - 25,000 SF
Construction
$8,279,000 est. value
Cleveland, OH 44103

PK-12 School
New Construction, Demolition
Construction
Springfield, OH 45503

Medina Christian Academy Expansion - Master Plan
Addition
Pending Verification
Medina, OH 44256

2021 Bond Construction & Renovation Projects
New Construction, Renovation
Conception
Northfield, OH

Cloverleaf High & Middle School Construction
New Construction - 140,000 SF
Design
$40,000,000 est. value
Lodi, OH 44254

Last Updated 02/22/2022 10:10 AM
Project Title

Madison Local Cosmetology Renovation

Physical Address View project details and contacts
City, State (County) Mansfield, OH 44905   (Richland County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $240,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Alteration of the cosmetology lab at Madison High School. General Construction: General construction work consists of, but not limited to demolition of masonry & stud walls, doors & frames, ceiling tile & grid, casework, markerboards. Renovation work includes stud and gypsum board interior partitions; doors, door frames and hardware; acoustical ceiling tiles and grid; cabinets and casework, lockers, floor coverings, painting, wall tile and vinyl wall covering, interior signage, installation of owner supplied salon equipment, and other related work. Plumbing Work: Includes installation of new owner-provided fixture, associated piping, core drilling and excavating as required to serve future work in cosmetology lab. HVAC Work: Includes new air devices and associated ductwork and demolition of indicated existing HVAC items. Electrical Work: Electrical work consists of, but not limited to demolition of power, lighting devices, light fixtures, and technology devices. New work consists of power to new receptacles (surface raceway where required, salon equipment, teacher demonstration station, and student salon desks. Also, new LED lighting throughout controlled by occupancy sensors, and low voltage switches. Installation of drytype transformer and 120/208V branch circuit panel. Technology Work:/ Technology work consists of, but not limited to demolition of current technology systems. New work consist of cat6 cabling to new wall outlets for network connectivity from main telecommunications room. Also supply of new Interactive flat panel, and mobile cart for interactive flat panel.

Details

1 Middle/Senior High School, 3,238 SF Renovation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents