Similar Projects
North Middletown Road Pedestrian Link Project
Bidding
Pearl River, NY 10965

New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

North Broadway Sidewalks
Results
Upper Nyack, NY 10960

State Bicycle Route 9 Shared Use Path Construction
Results
Less than $2,800,000 est. value
Clarkstown, Stony Point, NY 10980

Furnish and Install Reinforced Concrete Pads and Sidewalk
Post-Bid
West Haverstraw, NY 10993

Intersection Reconfiguration on US Rte 202 in The town of Haverstraw
Results
Less than $4,900,000 est. value
Haverstraw, Ramapo, NY 10927

Asphalt Paving & Concrete Sidewalk Modifications
Renovation
Post-Bid
Congers, NY 10920

Miles of Asphalt Concrete Resurfacing and Construction of Sidewalk on Route 17
Results
Less than $5,400,000 est. value

Courthouse - Dutch Garden South Entrance and Parking - Human Rights Memorial
Post-Bid
New City, NY 10956

Pavement Preventative Maintenance including Mill and Fill, 1.8 Miles along Route 303, 2.9 Miles along Route 17
Results
Less than $5,100,000 est. value

Parking, Landscaping, Lighting and Related Work
Post-Bid
Grand View-on-Hudson, NY

Concrete Curb 8 and Sidewalk Replacement Program
Results
New City, NY 10956

Pedestrian Safety Improvements
Post-Bid
$250,000 to $300,000 est. value
Nyack, NY 10960

2020 Curb and Sidewalk Program - Hudson Avenue
Results
Haverstraw, NY 10927

Last Updated 07/16/2020 09:23 AM
Project Title

New Connectivities for Nyack

Physical Address View project details and contacts
City, State (County) Nyack, NY 10960   (Rockland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Projects limits extend from: the border with South Nyack, along Broadway, to the border with Upper Nyack. Construction of sidewalk and pedestrian improvements over the entire length of North and South Broadway and bike paths to allow bikers safely to access Village facilities and connect to the Greenway Bike Path. EEO Employment goals for this project are: 22.6% Minority Employment Goal, 6.9% Women Employment Goal

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents