Similar Projects
38th Avenue Mixed-Use Development
New Construction - 42,900 SF
Design
New York, NY

Repair Men`s Showers, Building 1
Renovation
Post-Bid
Rome, NY

Highview Bathroom Renovations-3 Bathrooms
Renovation - 152 SF
Post-Bid
Suffern, NY 10901

1923 Building Renovations Flowers Park
Renovation
Results
New Rochelle, NY 10801

Rehabilitation of Pool and Bathhouse at Playland Park
Results
$21,000,000 to $23,000,000 est. value
Rye, NY

East Hampton Oyster Co Improvements
New Construction, Infrastructure - 6,802 SF
Pending Verification
East Hampton, NY 11937

Scenic Drive Bathroom and Garage Repairs
Renovation - 44 SF
Post-Bid
Suffern, NY 10901

Robinson Lane Park New Sanitary Disposal System and ADA Restroom
Results
Wappingers Falls, NY 12590

Single Stall Bathroom & Door Modification
Renovation - 75 SF
Post-Bid
New City, NY 10956

North Castle Community Park Comfort Station
New Construction
Results
Armonk, North Castle, NY 10504

Restroom Renovations
Renovation
Post-Bid
Valatie, NY 12184

Capital Projects Phase 2 - Putnam Valley Middle School Toilet Room Alterations
Results
Putnam Valley, NY 10579

Community Center Toilets at Woodside Houses
Renovation
Post-Bid
Queens, NY 11377

Rehabilitate Restrooms at NYS Police Farmington
Results
$100,000 to $250,000 est. value
Farmington, NY

Singing Waters Bath House Project
New Construction
Post-Bid
Lyons Falls, NY 13368

Last Updated 06/27/2022 07:00 AM
Project Title

New Gill Creek Park Comfort Station

Physical Address View project details and contacts
City, State (County) Niagara Falls, NY 14303   (Niagara County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $140,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new comfort station/restrooms at Gill Creek Park on Niagara Street and Hyde Park Boulevard. The New Gill Creek Park Restrooms shall consist offabrication and erection of a new precast concrete comfort station, including foundation, sitework, utilities and restoration, situated as shown on the Contract Drawings, as specified herein or as directed by the Owner's Representative. 1. Excavation and shoring 2. Stone bedding installation 3. Pipe and fitting installation 4. Select Granular backfilling Supply and install new corporation stop (1-1/2") Supply and install new water service box Supply and install new curb stop Supply and install new couplings & fittings, as required All required excavation and backfilling Any/all topsoil and sod margin and pavement restoration

Details

Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents