Similar Projects
Plaza Park Lights/Electrical Upgrades - NEW - City of Visalia
Infrastructure
Conception
$1,300,000 CJ est. value
Visalia, CA 93277

Riverway Splash Pad - NEW - City of Visalia
Renovation, Infrastructure
Conception
$467,400 CJ est. value
Visalia, CA 93291

Mammoth Townhomes
New Construction, Infrastructure - 9,676 SF
Design
$1,400,000 CJ est. value
Visalia, CA 93291

Ben Maddox Way Apartments
New Construction, Infrastructure - 189,087 SF
Design
$52,000,000 CJ est. value
Visalia, CA 93292

Les Schwab Tire Center / Visalia
New Construction, Infrastructure - 12,047 SF
Bidding
$2,400,000 CJ est. value
Visalia, CA 93277

Tule River Parkway Phase III
Infrastructure
Bidding
$1,998,950 CJ est. value
Porterville, CA 93257

Springville New Public Library
New Construction, Infrastructure - 3,000 SF
Post-Bid
$2,300,000 CJ est. value
Springville, CA 93265

Springville New Public Library
New Construction, Infrastructure - 3,000 SF
Post-Bid
$2,300,000 CJ est. value
Springville, CA 93265

Grading Peoples Basin
Infrastructure
Results
Woodlake, CA 93286

Elbow Creek Elementary Modular Site Work
Renovation, Infrastructure
Results
$450,000 est. value
Visalia, CA 93292

West Putnam Elementary School Classroom
Addition, Demolition, Infrastructure
Construction
$11,049,000 CJ est. value
Porterville, CA 93257

Pony Express / Visalia
New Construction, Infrastructure - 4,400 SF
Pending Verification
$1,000,000 CJ est. value
Visalia, CA 93291

St. George Spine and Pain Surgery Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 14,065 SF
Pending Verification
$1,000,000 CJ est. value
Visalia, CA 93277

Plaza Park Court Lighting Upgrade - NEW - City of Visalia
Infrastructure
Conception
$355,000 CJ est. value
Visalia, CA 93277

LifeStar Ambulance Maintenance Building
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Tulare, CA 93274

Last Updated 10/05/2022 12:36 AM
Project Title

Avenue 128/Teapot Dome and Road 216 Stormwater Retention Basin Project

Physical Address View project details and contacts
City, State (County) Porterville, CA 93257   (Tulare County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor License Required: Class A - General Engineering The work to be performed under this contract includes furnishing of all labor, materials, and equipment to construct a new stormwater retention basin, relocate an existing recirculation basin, construct new storm drainage facilities, and perform miscellaneous site work and facility relocations to construct the project The new stormwater retention basin would be constructed north of Avenue 128/Teapot Dome Road, east of the Friant Kern Canal, south of the extension of Avenue 130, and west of Road 216. The approximately volume of the new stormwater detention facility is approximately 200 acre-feet. Approximately 556,000 cubic yards of material will be cut and 13,200 cubic yards of material filled to construct the stormwater retention basin. The approximate earthwork total is 569,000 CY. The recirculation basin relocation will result in the construction of a replacement recirculation basin between the new stormwater retention basin and the extension of the Avenue 130 alignment. The new recirculation basin will be approximately 15 ft deep, have approximately 3.8 acre-feet of storage, and include the relocated pump and pump discharge from the City's wastewater outfall. The project includes construction of a new 72-inch storm drain constructed between the terminus of an existing irrigation ditch, extending south along West Street, west along the extension of Avenue 130, and south along Road 216 to the new stormwater retention basin. For additional information, please contact either Corina Harris at (559) 781-4271, extension 1042 and corina.harris@tulerivertribe-nsn.gov, or Curtis Lam at (530) 848-3938, clam@hydroscience.com. In addition, any requirements doing work on this Project as stated in the CEQA document that directly or indirectly affect the performance of the contract shall be accounted for and included as part of the Contractor's operating conditions and scope of work. Please note this is a prevailing wage project. The successful bidder will have 210 calendar days to complete the Project from date of issuance of Notice to Proceed. Any questions regarding the type of work to be done are to be in writing via email directed only to Corina Harris at corina.harris@tulerivertribe-nsn.gov, and Curtis Lam at clam@hydroscience.com. Responses will be provided to questions submitted up until August 25, 2022 at 11:00 AM, and responses will be recorded, and answers may be distributed to all known bidders at the Tribe's option. The Owner, in its sole discretion, may waive or permit the cure of nonmaterial variances in the bid. Non-material variances include but are not limited to failures to comply that: (i) do not affect overall responsiveness, (ii) are merely a matter of form or format, (iii) do not change the relative standing, or otherwise prejudice other Contractors, (iv) do not change the meaning or scope of these Contract Specifications, or (v) do not reflect a material change in the requirements of these Contract Specifications. Each bid must be submitted on the bid forms provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Tule River Indian Tribe, or cash from an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the Tule River Indian Tribe, each for not less than one hundred percent (100%) of the contract price. Pursuant to the California The Owner reserves the right to modify the terms of these Contract Specifications at any time in its sole discretion. This includes the right to cancel these Contract Specifications at any time for any reason whatsoever prior to entering into a contract with the apparent successful bidder. The Owner reserves the right to obtain and consider information from other sources concerning the Contractor, such as the Contractor's capability and performance under other contracts, the qualifications of any Subcontractor of consultants identified in the bid, the Contractor's financial stability, past or pending litigation, and other publicly available information. Owner reserves the right to request, and the Contractor agrees to furnish, any additional data required to support the information contained within their bid.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents