Similar Projects
Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Design
$150,000,000 CJ est. value
Goodyear, AZ 85338

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

City Elevator Upgrades South Tempe Water Treatment Plant (STWTP) and Johnny G. Martinez Water Treatment Plant (JGMWTP) Project
New Construction
Results
$442,860 est. value
Tempe, AZ 85281

Gilbert Road Bridge at Salt River
Infrastructure
Results
$48,586,929 CJ est. value
Chandler, AZ 85286

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

RFQ Design - Northeast Public Safety Facility
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Mesa, AZ 85207

Jomax Water Reclamation Facility Expansion - UT00388 - City of Peoria
Addition, Infrastructure
Conception
$65,499,546 CJ est. value
Peoria, AZ 85383

AutoZone #3000 / Phoenix
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Phoenix, AZ 85254

Monterey Park Expansion
Infrastructure
Post-Bid
$5,729,645 CJ est. value
Mesa, AZ 85201

Last Updated 11/22/2022 01:02 PM
Project Title

RFQ Construction Manager at Risk - Farallon Water Campus

Physical Address View project details and contacts
City, State (County) Buckeye, AZ 85326   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Buckeye is seeking a qualified construction manager/general contractor to provide preconstruction and construction services as the Construction Manager at Risk (CMAR) for the construction of Farallon Water Campus No 16. The CMAR services will be performed in two phases with two separate contracts. Phase I, the first contract, will include the pre-construction services and the preparation and submission of the (GMP). Phase II, the second contract, will include construction services for the construction of the project.It is anticipated that the project will be constructed using multiple GMP(s) or phases of construction. The City of Buckeye intends to procure a CMAR to construct the improvements described in this Section. As of November 22, 2022, the apparent low qualified bidder has been recommended to the selection panel.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents