Similar Projects
Banyan Boulevard Streetscape
Post-Bid
West Palm Beach, FL

Grounds Maintenance for Right-of-Way, Parking Facilities, Lincoln Road Mall, Lot Clearance and Coastal Areas
Term Contract
Post-Bid
Miami Beach, FL 33139

Landscaping
Results
Less than $304,854 est. value
FL

Mowing Services - Rural Collector Roads
Term Contract
Results
Brooksville, FL 34601

Roadway Mowing and Landscape and Stormwater Area (Sta) Maintenance
Term Contract
Post-Bid
$10,000,000 est. value
Stuart, FL

Landscaping
Results
Less than $2,049,193 est. value
FL

SECO Energy Storm Rates 2020 (Vegetation/Tree Trmming)
Post-Bid
Sumterville, FL

Roadside Maintenance
Results
Chipley, FL 32428

Tree Trimming
Post-Bid
Less than $43,000 est. value
FL

West King Street Landscaping Project
Results
Less than $75,000 est. value
Saint Augustine, FL 32084

Mowing
Post-Bid
Less than $225,000 est. value
FL

Construction of Crystal River Town Square
Results
Less than $820,683 est. value
Crystal River, FL 34428

Tree Trimming (BDI)
Post-Bid
Less than $200,000 est. value
FL

Tree, Stump and Brush Removal
Results
Less than $63,000 est. value
FL

Landscaped Roadway Mowing
Term Contract
Post-Bid
Tallahassee, FL 32301

Last Updated 05/13/2021 05:18 AM
Project Title

Remove Trees, Stumps, Debris, and Trim Trees

Physical Address View project details and contacts
City, State (County) (Dixie, Gilchrist, Levy Counties)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $65,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract to Remove Trees, Stumps, Debris and Trim Trees on an as Needed Basis by the Department in the Chiefland Maintenance Area. Renewal Option. Section 0001 Tree Trimming and Removal (Mh) E101- 72- Mobilization (Emergency Response) Ea 5.000 E580-332- 21 Tree Removal (4" to 12") Ea 100.000 E580-332- 22 Tree Removal (13" to 24") Ea 155.000 E580-332- 23 Tree Removal (25" to 36") Ea 10.000 E580-332- 24 Tree Removal (37" to 48") Ea 5.000 E580-332- 25 Tree Removal (> 48") Ea 4.000 E580-332- 97 Tree Trimming Ea 63.000 E580-334- 1 Stump Grinding (4" to 24") Ea 100.000 E580-334- 2 Stump Grinding (25" to 48") Ea 20.000 E580-334- 3 Stump Grinding (> 48") Ea 4.000

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents