Similar Projects
Whiting Lakefront Park Revetment Repairs
Infrastructure
Bidding
$50,000 est. value
Whiting, IN 46394

2020 Foss Ditch Maintenance
Renovation
Post-Bid
Crown Point, IN 46307

Quantity Purchase Award (QPA) Agreement for High Density Polyethylene and Profile Wall PVC Pipe Liner
Term Contract
Post-Bid

Taft Place/Bon Aire Lake Outlet Culvert Replacement
Results
Merrillville, IN 46410

129th Avenue Roadway and Drainage Improvements
Results
Less than $300,000 est. value
Cedar Lake, IN 46303

2022 Hart Ditch Stabilization through Munster
Infrastructure
Post-Bid
$350,000 est. value
Crown Point, IN

Lake George Canal Middle Section Restoration, Lake County, Indiana
Results
$10,000,000 to $25,000,000 est. value
IN

2022 Stoney Run Ditch - Middle Branch Drain Tile Replacement
Infrastructure
Post-Bid
$75,000 est. value
IN

Steel Pipe
Infrastructure
Results

Corrugated Pipe for Dale Subdistrict
Infrastructure
Results

Corrugated Pipe For Washington Subdistrict
Infrastructure
Results

2021 Beaver Dam Ditch Lateral No. 5 Culvert Replacement Bike/Pedestrian Trail
Infrastructure
Results
Crown Point, IN 46307

2021 Main Beaver Dam Ditch Maintenance Clay Street to West of Blaine Street
Infrastructure
Results
Crown Point, IN

Small Structure Replacement, Pipe Lining, and Maintenance
Infrastructure
Results

Bruce Ditch Maintenance Phase II
Infrastructure
Results
Lowell, IN 46356

Last Updated 05/24/2022 01:32 PM
Project Title

Lake George Shoreline Stabilization

Physical Address View project details and contacts
City, State (County) Hobart, IN   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of stabilizing approximately 1,400 linear feet of Lake George shoreline adjacent to Hobart middle school between 7th and 8th Avenue. Construction activities will include clearing and grubbing, earthwork and grading, installation of stone, planting, seeding, and erosion control blanket installation

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents