Similar Projects
Rusty Taco
Build-Out
Conception
San Antonio, TX

Slim Chickens
New Construction
Conception
San Antonio, TX 78254

Chick-fil-A #2632
Renovation - 1,865 SF
Design
San Antonio, TX 78209

Wendy's #1044 Refresh
Renovation - 2,867 SF
Design
San Antonio, TX 78219

Renovations of Food Service Areas at Designated HCC Campuses
Renovation
Bidding
$673,891 CJ est. value
Fort Sam Houston, TX 78234

Bubba's 33 / San Antonio (South)
New Construction, Infrastructure - 7,575 SF
Bidding
$2,310,375 CJ est. value
San Antonio, TX 78235

Cornerstone Church Phase 2 Community Hall Addition (Sub Bid)
Addition, Demolition, Infrastructure - 69,100 SF
Sub-Bidding
$400,000 CJ est. value
San Antonio, TX 78258

Women's & Children's Hospital Tower - Kitchen, Servery Dining & Conference Finish Out Package 10
Build-Out
Post-Bid
est. value
San Antonio, TX 78229

Target #T2278 - Beverage Bar Removal
Renovation, Demolition
Post-Bid
Temple, TX 76504

McDonald's Remodel
Renovation
Construction
$350,000 est. value
San Antonio, TX 78245

Domino's Pizza
Build-Out - 1,700 SF
Construction
San Antonio, TX 78228

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Starbucks- S Timberland Dr and Chestnut St/ Lufkin
Renovation
Pending Verification
$175,000 CJ est. value
Lufkin, TX 75901

Roll-Em-Up Taquitos
New Construction - 1,700 SF
Conception
$500,000 to $1,000,000 CJ est. value
San Antonio, TX

Wendy's #01319 - Fredicksburg Road / San Antonio
Renovation - 2,867 SF
Design
$100,000 CJ est. value
San Antonio, TX 78201

Last Updated 09/06/2022 10:34 AM
Project Title

Finish Out for New Bar / China Spring Retail

Physical Address View project details and contacts
City, State (County) Waco, TX 76708   (McLennan County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lease space finish out for new bar. As of September 2022, final planning is underway. Information regarding a general contractor or selection has not been provided. A firm timeline has not been established, however, construction is expected to begin mid-October 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,941 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents